Search
You searched for:
Start Over
History
Remove constraint History
Subject
Construction workers
Remove constraint Subject: Construction workers
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
Subject
Tule Lake Region (California)
Remove constraint Subject: Tule Lake Region (California)
Subject
Tule Lake Sump (California)
Remove constraint Subject: Tule Lake Sump (California)
Material Types
Image
Remove constraint Material Types: Image
« Previous | 1 - 10 of 25 | Next »
Search Results
-
1. [Image] TULE LAKE SUMP 2, PUMPING PLANT 9
KP-2526-R2-Klamath Project -- TULE LAKE SUMP 2, PUMPING PLANT 9. View looking north showing driving of sheet piling for structure. Sheet piling in background was driven by contractor to protect excavation; ...Citation -
KP-2419-R2 - TULE LAKE SUMP 3 - Klamath Project. Experimental drainage program in League of Nations lease tract. View of temporary drainage pump installation. CMP pump chamber, which is supported on piling ...
Citation -
P12-200-2904NA Klamath Project - Oregon-California. Overall view of pipe laying operation. Dump truck is almost empty. Fields are covered with snow; December 1972; Bureau of Reclamation photo by D. ...
Citation -
P12-200-2905NA Klamath Project - Oregon-California. View of pipe laying operation; December 1972; Bureau of Reclamation photo by D. W. Stein
Citation -
P12-200-2909NA Klamath Project - Oregon-California. View of contractor's equipment. Cinders are fed into conveyor belt from dump truck and then into the hopper unit mounted on the back of the trenching ...
Citation -
P12-200-2910NA Klamath Project - Oregon-California. View of trencher starting to excavate a drain line. The hopper and digging unit are dropped into place at the outlet of the proposed line. Then, the ...
Citation -
P12-200-2917NA Klamath Project - Oregon-California. View of trenching equipment. The trencher is almost at the end of a newly installed closed drain line. Note the workman threading a short section of ...
Citation -
P12-200-2920NA Klamath Project - Oregon-California. Inspector Derrill Stein is shown in foreground. He is watching the construction operation to see that the work performed by the contractor meets the ...
Citation -
P12-200-2927NA Klamath Project - Oregon-California. Conveyor belt used to move cinders from dump truck to the hopper unit; November 1972; Bureau of Reclamation photo by D. W. Stein
Citation -
10. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
P12-200-2928NA Klamath Project - Oregon-California. View of contractor's workers threading plastic drainage tubing into hopper unit; November 1972; Bureau of Reclamation photo by D. W. SteinCitation