  • 3920
    P12-200-2909NA Klamath Project - Oregon-California. View of contractor's equipment. Cinders are fed into conveyor belt from dump truck and then into the hopper unit mounted on the back of the trenching ...
    Citation
  • 3921
    P12-200-2910NA Klamath Project - Oregon-California. View of trencher starting to excavate a drain line. The hopper and digging unit are dropped into place at the outlet of the proposed line. Then, the ...
    Citation
  • 3928
    P12-200-2917NA Klamath Project - Oregon-California. View of trenching equipment. The trencher is almost at the end of a newly installed closed drain line. Note the workman threading a short section of ...
    Citation
  • 3931
    P12-200-2920NA Klamath Project - Oregon-California. Inspector Derrill Stein is shown in foreground. He is watching the construction operation to see that the work performed by the contractor meets the ...
    Citation
  • 3940
    P12-200-2929NA Klamath Project - Oregon-California. View of small crawler tractor being used to backfill the open trench. Excavated earth, windrowed along the open trench, provides the material needed ...
    Citation
  • 3947
    P12-200-2936NA Klamath Project - Oregon-California. View of a workman using a whacker to obtain the required compaction at the outlet end of the drain line; December 1972; Bureau of Reclamation photo ...
    Citation
  • 3949
    P12-200-2938NA Klamath Project - Oregon-California. View of pipe laying and trenching equipment taken from down in the trench; December 1972; Bureau of Reclamation photo by D. W. Stein
    Citation
  • 4104
    P-12-200-3091NA Klamath Project - Oregon-California. General view of trenching and installing cinders and pipe on Closed Drain #53-2; February 1975; USBR photo by D. W. Stein
    Citation