Search
You searched for:
Start Over
Land use history
Remove constraint Land use history
Subject
Construction workers
Remove constraint Subject: Construction workers
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
Subject
Tule Lake Sump (California)
Remove constraint Subject: Tule Lake Sump (California)
Database
Klamath Waters Library
Remove constraint Database: Klamath Waters Library
1 - 8 of 8
Search Results
-
P12-200-2910NA Klamath Project - Oregon-California. View of trencher starting to excavate a drain line. The hopper and digging unit are dropped into place at the outlet of the proposed line. Then, the ...
Citation -
P12-200-2917NA Klamath Project - Oregon-California. View of trenching equipment. The trencher is almost at the end of a newly installed closed drain line. Note the workman threading a short section of ...
Citation -
P12-200-2927NA Klamath Project - Oregon-California. Conveyor belt used to move cinders from dump truck to the hopper unit; November 1972; Bureau of Reclamation photo by D. W. Stein
Citation -
P12-200-2929NA Klamath Project - Oregon-California. View of small crawler tractor being used to backfill the open trench. Excavated earth, windrowed along the open trench, provides the material needed ...
Citation -
P12-200-2936NA Klamath Project - Oregon-California. View of a workman using a whacker to obtain the required compaction at the outlet end of the drain line; December 1972; Bureau of Reclamation photo ...
Citation -
CN-12-201-184NA Klamath Project - Oregon-California. Side view of the hopper unit used to feed both pipe and cinders into the trench. The digging chain for the trencher is mounted directly in front of ...
Citation -
CN-12-201-296NA Klamath Project - Oregon-California. Experimental Line in Unit 71. Connection to the steel outlet pipe was made in the same manner as with the unsheathed tubing. Plastic tape is used to ...
Citation -
CN-12-200-64A Klamath Project - Oregon-California. Looking west at equipment developed and used by Contractor to excavate and install plastic drainage tubing in one operation. Note that the trencher tows ...
Citation