Search

You searched for: Start Over Irrigation Remove constraint Irrigation Subject Construction workers Remove constraint Subject: Construction workers Subject Irrigation canals and flumes -- Design and construction Remove constraint Subject: Irrigation canals and flumes -- Design and construction Database Klamath Waters Library Remove constraint Database: Klamath Waters Library

Search Results

  • 1215
    865 Klamath; June 14, [1939?]
    Citation
  • 1851
    KP-1505-R2 - Klamath Project; First pass with a 4" X 6" strike-off, pulled by winch; Time 1:25 P. M., July 18, 1947; Stacy, contractor; Photo by H. W. Sexton
    Citation
  • 1852
    KP-1506-R2 - Klamath Project; Filling in the last of the required concrete. The 4" X 6" strike-off is almost to the top on the first pass. Later is was put to the bottom and a vibrator inserted in the ...
    Citation
  • 1853
    KP-1507-R2 - Klamath Project; Using 2" X 4" strike-off, the improvement in the surface, caused by the second pass of the 4" X 6" strike-off, is readily noted above the 2" X 4" strike-off; July 18, 1947; ...
    Citation
  • 1854
    KP-1508-R2 - Klamath Project; Using wood bull float after striking off with 2 x 4; Time approximately 1:40 P. M., July 18, 1947; Stacy, contractor; Photo by H. W. Sexton
    Citation
  • 1855
    KP-1509-R2 - Klamath Project; Using Fresno float (steel) after bull float; Time approximately 1:44 P. M., July 18, 1947; Stacy, contractor; Photo by H. W. Sexton
    Citation
  • 1909
    KP-1555 - Klamath Project - Coppock Bay; September 24, 1947; Photo by Dorwin Grise
    Citation
  • 2242
    KP-23; March 31, 1949; Photo by M. D. Taylor, Jr.
    Citation
  • 2243
    KP-24. Klamath Project. Check form in the background; March 31, 1949; Photo by M. D. Taylor, Jr.
    Citation
  • 2323
    KP-1827-R2. Lost River Diversion Channel Headworks. Close-up of vibrating concrete and dumping bucket. (1/2-yard bucket); July 13, 1949; Photo by C. O. Wamstad
    Citation