    P12-200-2910NA Klamath Project - Oregon-California. View of trencher starting to excavate a drain line. The hopper and digging unit are dropped into place at the outlet of the proposed line. Then, the ...
    Citation
  • 3928
    P12-200-2917NA Klamath Project - Oregon-California. View of trenching equipment. The trencher is almost at the end of a newly installed closed drain line. Note the workman threading a short section of ...
    Citation
  • 3931
    P12-200-2920NA Klamath Project - Oregon-California. Inspector Derrill Stein is shown in foreground. He is watching the construction operation to see that the work performed by the contractor meets the ...
    Citation
  • 3942
    P12-200-2931NA Klamath Project - Oregon-California. Rear-end view of hopper unit. Pipe is fed out of the round hole at the bottom and cinders are placed around the pipe as it is being extruded from the ...