Search

You searched for: Start Over Irrigation Remove constraint Irrigation Subject Construction equipment Remove constraint Subject: Construction equipment

Search Results

  • 1852
    KP-1506-R2 - Klamath Project; Filling in the last of the required concrete. The 4" X 6" strike-off is almost to the top on the first pass. Later is was put to the bottom and a vibrator inserted in the ...
    Citation
  • 1853
    KP-1507-R2 - Klamath Project; Using 2" X 4" strike-off, the improvement in the surface, caused by the second pass of the 4" X 6" strike-off, is readily noted above the 2" X 4" strike-off; July 18, 1947; ...
    Citation
  • 1854
    KP-1508-R2 - Klamath Project; Using wood bull float after striking off with 2 x 4; Time approximately 1:40 P. M., July 18, 1947; Stacy, contractor; Photo by H. W. Sexton
    Citation
  • 1855
    KP-1509-R2 - Klamath Project; Using Fresno float (steel) after bull float; Time approximately 1:44 P. M., July 18, 1947; Stacy, contractor; Photo by H. W. Sexton
    Citation
  • 1845
    KP-1499-R2 - Klamath Project; [June, 1947]; Photo by Dorwin Grise
    Citation
  • 1868
    KP-1515-R2 - Klamath Project; July 25, 1947; Photo by Dorwin Grise
    Citation
  • 1872
    KP-1519-R2 - Klamath Project. Looking north at Station 48-00; August 14, 1947; Photo by D. H. Gross
    Citation
  • 1874
    KP-1521-R2 - Klamath Project; August 14, 1947; Photo by D. H. Gross
    Citation
  • 2323
    KP-1827-R2. Lost River Diversion Channel Headworks. Close-up of vibrating concrete and dumping bucket. (1/2-yard bucket); July 13, 1949; Photo by C. O. Wamstad
    Citation
  • 2325
    KP-1829-R2. Lost River Diversion Channel Headworks. Same as KP-1828-R2, only looking downstream; July 13, 1949; Photo by G. F. Klink
    Citation