Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Subject
Construction equipment
Remove constraint Subject: Construction equipment
Subject
Pumping stations -- Design and construction
Remove constraint Subject: Pumping stations -- Design and construction
Material Types
Image
Remove constraint Material Types: Image
« Previous | 1 - 10 of 12 | Next »
Search Results
-
1. [Image] Adams Pumping Plant - Loading concrete bucket from 4. cu. yd. transit mix truck for wall pour
KP-1788-R2 - Adams Pumping Plant; May 25, 1949; Photo by C. O. WamstadCitation -
P12-201-4283 NA Klamath Project Oregon-California. Pumping Plant EE excavation with one-half soldier piling driven to depth and the other half set in place only; December 14, 1976; USBR photo by D. J. ...
Citation -
P12-201-4316 NA Klamath Project, OR-CA. Completed bents No. 1 and 2 of construction bridge with P+H 670 in position to drive piling in Plant EE; January 18, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4318 NA Klamath Project, OR-CA. Vulcan No. 1 hammer to be used in Pumping Plant EE pile driving; January 18, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4319 NA Klamath Project, OR-CA. Shown is Row 12 vertical piling driven before cutoff at Pumping Plant EE site; January 20, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4321 NA Klamath Project, OR-CA. Pumping Plant EE - Setting batter piling butt into hammer lead; January 24, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4351 NA Klamath Project, OR-CA. E-Con placer elephant trunk placing concrete in plant EE slab; March 21, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4352 NA Klamath Project, OR-CA. Both E-Con placers in operation here, placing middle section of Plant EE slab. Left section was previously completed; March 21, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4353 NA Klamath Project, OR-CA. Finishers using scrreds to float out middle section of Plant EE slab; March 21, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4360 NA Klamath Project, OR-CA. Placement of bottom slab at Plant FF ( 300+Yd³). 10 cu. yd. transit mixer backing down ramp to discharge into hopper of E-Con placer; May 5, 1977; USBR photo by ...
Citation