Search

You searched for: Start Over History Remove constraint History Subject Construction equipment Remove constraint Subject: Construction equipment Subject Klamath Project (U.S.) -- History Remove constraint Subject: Klamath Project (U.S.) -- History Subject Pumping stations -- Design and construction Remove constraint Subject: Pumping stations -- Design and construction Database Klamath Waters Library Remove constraint Database: Klamath Waters Library

Search Results

  • 2256
    KP-1788-R2 - Adams Pumping Plant; May 25, 1949; Photo by C. O. Wamstad
    Citation
  • 4364
    P12-201-4283 NA Klamath Project Oregon-California. Pumping Plant EE excavation with one-half soldier piling driven to depth and the other half set in place only; December 14, 1976; USBR photo by D. J. ...
    Citation
  • 4398
    P12-201-4316 NA Klamath Project, OR-CA. Completed bents No. 1 and 2 of construction bridge with P+H 670 in position to drive piling in Plant EE; January 18, 1977; USBR photo by D. J. Kline
    Citation
  • 4400
    P12-201-4318 NA Klamath Project, OR-CA. Vulcan No. 1 hammer to be used in Pumping Plant EE pile driving; January 18, 1977; USBR photo by D. J. Kline
    Citation
  • 4401
    P12-201-4319 NA Klamath Project, OR-CA. Shown is Row 12 vertical piling driven before cutoff at Pumping Plant EE site; January 20, 1977; USBR photo by D. J. Kline
    Citation
  • 4403
    P12-201-4321 NA Klamath Project, OR-CA. Pumping Plant EE - Setting batter piling butt into hammer lead; January 24, 1977; USBR photo by D. J. Kline
    Citation
  • 4432
    P12-201-4351 NA Klamath Project, OR-CA. E-Con placer elephant trunk placing concrete in plant EE slab; March 21, 1977; USBR photo by D. J. Kline
    Citation
  • 4433
    P12-201-4352 NA Klamath Project, OR-CA. Both E-Con placers in operation here, placing middle section of Plant EE slab. Left section was previously completed; March 21, 1977; USBR photo by D. J. Kline
    Citation
  • 4434
    P12-201-4353 NA Klamath Project, OR-CA. Finishers using scrreds to float out middle section of Plant EE slab; March 21, 1977; USBR photo by D. J. Kline
    Citation
  • 4442
    P12-201-4360 NA Klamath Project, OR-CA. Placement of bottom slab at Plant FF ( 300+Yd³). 10 cu. yd. transit mixer backing down ramp to discharge into hopper of E-Con placer; May 5, 1977; USBR photo by ...
    Citation