You searched for: Start Over Irrigation Remove constraint Irrigation Subject Concrete slabs Remove constraint Subject: Concrete slabs Subject Klamath Straits Drain (Oregon) Remove constraint Subject: Klamath Straits Drain (Oregon) Database Klamath Waters Library Remove constraint Database: Klamath Waters Library

Search Results

  • 4598
    P12-201-4516 NA Klamath Project, OR-CA. Ady Siphon -- This view looking from west to east into siphon outlet. Note SP railroad tracks across top of photo. At this point, concrete placement on slab portion ...
    Citation
  • 4551
    P12-201-4469 NA Klamath Project, OR-CA. Ady Canal--view looking east at siphon inlet transition slab area. Concrete has just been placed for slab area and is in process of being covered, for cold weather ...
    Citation
  • 4441
    P12-201-4359 NA Klamath Project, OR-CA. Applying final concrete lift on this section (SW corner) of Plant FF bottom slab; May 5, 1977; USBR photo by D. J. Kline
    Citation
  • 4442
    P12-201-4360 NA Klamath Project, OR-CA. Placement of bottom slab at Plant FF ( 300+Yd³). 10 cu. yd. transit mixer backing down ramp to discharge into hopper of E-Con placer; May 5, 1977; USBR photo by ...
    Citation
  • 4443
    P12-201-4361 NA Klamath Project, OR-CA. Pumping Plant FF slab concrete placement. View shows placing concrete for first lift. (Slab was placed in two lifts). Vibration was by means of two air-powered vibrators ...
    Citation
  • 4459
    P12-201-4377 NA Klamath Project, OR-CA. Pumping Plant FF--View looking south of concrete placement for walls up to base of Elev. B slab; May 31, 1977; USBR photo by D. J. Kline
    Citation
  • 4460
    P12-201-4378 NA Klamath Project, OR-CA. Pumping Plant FF--View looking west at placement for slab foundation. E-Con placer setting up to unload mixer truck; May 1977; USBR photo by D. J. Kline
    Citation
  • 4461
    P12-201-4379 NA Klamath Project, OR-CA. Pumping Plant FF--Placement for foundation slab; two bays completed and preparing to start on third and last bay. View looking sw. Workers at inlet side of slab; ...
    Citation
  • 4462
    P12-201-4380 NA Klamath Project, OR-CA. Pumping Plant FF--View looking southeast: slab completed. Burke-White pigmented curing compound has been applied by spray. Three smudge pot heaters placed in ...
    Citation
  • 4463
    P12-201-4381 NA Klamath Project, OR-CA. Pumping Plant EE--Preparation for placement of pump deck (Elev. B) slab. Note contractor wetting down rebar prior to placement; May 20, 1977; USBR photo by D. ...
    Citation