Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Subject
Concrete slabs
Remove constraint Subject: Concrete slabs
Subject
Klamath Straits Drain (Oregon)
Remove constraint Subject: Klamath Straits Drain (Oregon)
Database
Klamath Waters Library
Remove constraint Database: Klamath Waters Library
« Previous | 1 - 10 of 14 | Next »
Search Results
-
P12-201-4516 NA Klamath Project, OR-CA. Ady Siphon -- This view looking from west to east into siphon outlet. Note SP railroad tracks across top of photo. At this point, concrete placement on slab portion ...
Citation -
P12-201-4469 NA Klamath Project, OR-CA. Ady Canal--view looking east at siphon inlet transition slab area. Concrete has just been placed for slab area and is in process of being covered, for cold weather ...
Citation -
P12-201-4359 NA Klamath Project, OR-CA. Applying final concrete lift on this section (SW corner) of Plant FF bottom slab; May 5, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4360 NA Klamath Project, OR-CA. Placement of bottom slab at Plant FF ( 300+Yd³). 10 cu. yd. transit mixer backing down ramp to discharge into hopper of E-Con placer; May 5, 1977; USBR photo by ...
Citation -
P12-201-4361 NA Klamath Project, OR-CA. Pumping Plant FF slab concrete placement. View shows placing concrete for first lift. (Slab was placed in two lifts). Vibration was by means of two air-powered vibrators ...
Citation -
P12-201-4377 NA Klamath Project, OR-CA. Pumping Plant FF--View looking south of concrete placement for walls up to base of Elev. B slab; May 31, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4378 NA Klamath Project, OR-CA. Pumping Plant FF--View looking west at placement for slab foundation. E-Con placer setting up to unload mixer truck; May 1977; USBR photo by D. J. Kline
Citation -
P12-201-4379 NA Klamath Project, OR-CA. Pumping Plant FF--Placement for foundation slab; two bays completed and preparing to start on third and last bay. View looking sw. Workers at inlet side of slab; ...
Citation -
P12-201-4380 NA Klamath Project, OR-CA. Pumping Plant FF--View looking southeast: slab completed. Burke-White pigmented curing compound has been applied by spray. Three smudge pot heaters placed in ...
Citation -
P12-201-4381 NA Klamath Project, OR-CA. Pumping Plant EE--Preparation for placement of pump deck (Elev. B) slab. Note contractor wetting down rebar prior to placement; May 20, 1977; USBR photo by D. ...
Citation