P-12-200-4070NA Klamath Project - Oregon. Concrete being placed for front steps of building. This work is being done to repair damage which occurred to the building as a result of the August 10 fire; ...
Citation -
P-12-200-4071NA Klamath Project - Oregon. Concrete being finished on front steps of building. This work is being done to repair damage which occurred to the building as a result of the August 10 fire; ...
Citation -
P12-201-4484 NA Klamath Project, OR-CA. Overall view downstream of PP 'FF'. Note concrete placement operation; Nov. 2, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4495 NA Klamath Project, OR-CA. Concrete placement of PP FF inlet to siphon structure. Looking from west at oulet end; November 30, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4575NA Klamath Project, OR-CA. Center Canal Flume Bridge. Assembly of 4 prestressed 11-ton concrete beams. Note dowels and Elasto Meric bearing pads in place (south abutment); April 21, 1978; ...
Citation -
P-12-200-3011NA Klamath Project - Oregon-California. Concrete forms and bracing of the left abutment; March 28, 1974; Bureau of Reclamation photo by J. A. Renning
Citation -
P12-201-4364 NA Klamath Project, OR-CA. Pumping Plant EE--E-Con placer with 50 ft. of 5" lining, placing concrete for walls at Plant EE. Placed an average of 40 cu. yds. per hour. Concrete was batched ...
Citation -
P12-201-4458 NA Klamath Project, OR-CA. Pumping Plant FF--north retaining wall section "B" of slab step section. Concrete placement in progress; September 1977; USBR photo by D.J. Kline
Citation -
P12-201-4470 NA Klamath Project, OR-CA. Placing concrete in walls of outlet structure of FF. Concrete being pumped into forms by E Con Pacer and vibrated by electric vibrator.--PP FF; October 1977; ...
Citation -
P12-201-4471 NA Klamath Project, OR-CA. Ady Canal -- Concrete is being placed in slab of inlet into syphon. Concrete is wet batched from CPI plant from Klamath Falls, OR. It is hauled out to job site in ...
Citation