Search
You searched for:
Start Over
History
Remove constraint History
Subject
Clear Lake Dam (California)
Remove constraint Subject: Clear Lake Dam (California)
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
Subject
Trucks
Remove constraint Subject: Trucks
Material Types
Image
Remove constraint Material Types: Image
1 - 9 of 9
Search Results
-
P-12-200-2952NA Klamath Project - Oregon-California. View shows dumping concrete from a 7 cubic yard White mixer truck into a 1 cubic yard bucket. Mr. Don Thompson, sub-contractor, is standing beside ...
Citation -
P-12-200-2960NA Klamath Project - Oregon-California. Contractor's dry batch plant. View showing 7 cubic yard Rex mixer truck being loaded with sand and aggregate; April 1974; Bureau of Reclamation photo ...
Citation -
P-12-200-2961NA Klamath Project - Oregon-California. View of dry batch plant. Three cubic yard front end loader in the process of filling the hopper with sand and aggregate. Note the scale dial on left ...
Citation -
P-12-200-2996NA Klamath Project - Oregon-California. View of bobtailed truck and trailer, unloading sand and aggregate for concrete at Clear Lake Dam. This was an owner-operated truck; May 1974; Bureau ...
Citation -
P-12-200-2997NA Klamath Project - Oregon-California. View of bobtailed truck and trailer, unloading sand and aggregate for concrete at Clear Lake Dam. (This was an owner-operated truck); May 1974; Bureau ...
Citation -
P-12-200-2998NA Klamath Project - Oregon-California. View of bobtailed truck and trailer unloading sand and aggregate for concrete at Clear Lake Dam. (Owner operator's); May 1974; Bureau of Reclamation ...
Citation -
P-12-200-3004NA Klamath Project - Oregon-California. Photo showing sub-contractor placing concrete along spillway crest section between Sta. 1+00 and Sta. 1+30. Concrete was mixed in mixer truck and placed ...
Citation -
8. [Image] Clear Lake Spillway Rehabilitation - Specs. 200C-889 - Roy D. Garren Corporation, Contractor
P-12-200-3047NA Klamath Project - Oregon-California. View of 977-K Loader filling 10 cubic yard Ford end-dump truck with backfill material. The backfill material will be placed behind the end walls; ...Citation -
9. [Image] Clear Lake Spillway Rehabilitation - Specs. 200C-889 - Roy D. Garren Corporation, Contractor
P-12-200-3050NA Klamath Project - Oregon-California. View of right wall. 10 cubic yard end dump truck unloading load of backfill material; June 1974; USBR photo by D. W. SteinCitation