Search

You searched for: Start Over Photos Remove constraint Photos Subject Center Canal (Oregon) Remove constraint Subject: Center Canal (Oregon)

Search Results

  • 4394
    P12-201-4313 NA Klamath Project, OR-CA. Center Canal - Contractor built an earth diversion dam at inlet to 48" CMP turnout located adjacent to flume inlet transition; January 17, 1977; USBR photo by ...
    Citation
  • 4404
    P12-201-4322 NA Klamath Project, OR-CA. Center Canal - Case 580 Construction King used to break 18" frost layer for flume extension floor; January 25, 1977; USBR photo by D. J. Kline
    Citation
  • 4405
    P12-201-4323 NA Klamath Project, OR-CA. Center Canal - Floor form for pier extension over flume pier excavation; January 25, 1977; USBR photo by D. J. Kline
    Citation
  • 4406
    P12-201-4324 NA Klamath Project, OR-CA. View of flume outlet transition prior to placement of compacted backfill - Center Canal Flume; February 7, 1977; USBR photo by D. J. Kline
    Citation
  • 4407
    P12-201-4325 NA Klamath Project, OR-CA. Compacting backfill material with wacker on flume inlet transition - Center Canal Flume; February 11, 1977; USBR photo by D. J. Kline
    Citation
  • 4408
    P12-201-4326 NA Klamath Project, OR-CA. Center Canal Flume - Repairing flume of north outside wall. Workers are dry packing snap tie holes and putting on dry sacking finish cement; February 17, 1977; ...
    Citation
  • 4450
    P12-201-4368 NA Klamath Project, OR-CA. Center Canal Flume--Flume damage looking west to east. Note bow in left wall between the two temporary top ties; May 16, 1977; USBR photo by D. J. Kline
    Citation
  • 4451
    P12-201-4369 NA Klamath Project, OR-CA. Center Canal Flume--Starting to couple together two 40 ft. sections of asphalt-dipped 24-inch CMP. This was installed as a temporary means of water conveyance ...
    Citation
  • 4452
    P12-201-4370 NA Klamath Project, OR-CA. Center Canal Flume--Slide gate and coffer dam at inlet end of flume; May 21, 1977; USBR photo by D. J. Kline
    Citation
  • 4454
    P12-201-4372 NA Klamath Project, OR-CA. Center Canal Flume--Completed pipeline traversing flume inlet curve. Pipe was racked to take curve naturally; May 23, 1977; USBR photo by D. J. Kline
    Citation