  • 4588
    P12-201-4506 NA Klamath Project, OR-CA. Center Canal Flume -- View of floor and south wall looking down at the joint between the new and old portions of the flume. This joint was repaired using a rubber ...
    Citation
  • 4589
    P12-201-4507 NA Klamath Project, OR-CA. Center Canal Flume -- View showing removal of Center Canal Flume inlet dike after completion of flume repairs. Case 580-C Extend-A-Hoe used for dike removal; January ...
    Citation
  • 4590
    P12-201-4508 NA Klamath Project, OR-CA. Center Canal Flume -- View looking SE at outlet area of Center Canal Flume after second dewatering was removed and after flume repairs were completed; January 13, ...
    Citation
  • 4628
    P12-201-4546NA Klamath Project, OR-CA. Center Canal Flume Bridge. For safety of flume, water jet return trench was excavated from east side of pile trench to KSD. No jetting return was evident in flume ...
    Citation
  • 4629
    P12-201-4547NA Klamath Project, OR-CA. Center Canal Flume Bridge. Jet trench excavated on north side of flume, same design as south side return trench. This trench did not work, however, as jetting ...
    Citation
  • 4631
    P12-201-4549NA Klamath Project, OR-CA. Center Canal Flume Bridge. Wet area shows where unwanted jetting return was exiting into the west side of the drain on NE side of the flume; April 5, 1978; USBR ...
    Citation
  • 4632
    P12-201-4550NA Klamath Project, OR-CA. Center Canal Flume Bridge. Lowered water level in flume. Refilled first jet return trench and dug a second deeper trench on an angle toward Pumping Plant E. These ...
    Citation
  • 4633
    P12-201-4551NA Klamath Project, OR-CA. Center Canal Flume Bridge. Second return trench was cut into portions of the pile trench and worked well along with other measures to contain jet return; April ...
    Citation
  • 4641
    P12-201-4559NA Klamath Project, OR-CA. Center Canal Flume Bridge. Note 3' long x 1' wide x 1/4 " steel (Schedule 20) sleeves to be used by RHC to splice piles that did not reach minimum penetration; ...
    Citation
  • 4642
    P12-201-4560NA Klamath Project, OR-CA. Center Canal Flume Bridge. Two holes precut into steel sleeve on one side only, prior to pile fitting; April 4, 1978; USBR photo by D.J. Kline
    Citation