Search

You searched for: Start Over Land use history Remove constraint Land use history Subject Center Canal (Oregon) Remove constraint Subject: Center Canal (Oregon) Subject Irrigation projects Remove constraint Subject: Irrigation projects Subject Klamath Straits Drain (Oregon) Remove constraint Subject: Klamath Straits Drain (Oregon) Subject Piling (Civil engineering) Remove constraint Subject: Piling (Civil engineering)

Search Results

  • 4644
    P12-201-4562NA Klamath Project, OR-CA. Center Canal Flume Bridge. The steel sleeve was placed on the pile and the holes in the sleeve were marked on the pile. The sleeve was then removed and a ship's ...
    Citation
  • 4646
    P12-201-4564NA Klamath Project, OR-CA. Center Canal Flume Bridge. The top or splice piling is inserted into the sleeve and then the ship's auger was used to bore out the hole for the 3/4 " bolt; April ...
    Citation
  • 4546
    P12-201-4464 NA Klamath Project, OR-CA. Center Canal Flume--Old timber piling used for flume support in original construction. 12' long max. Note: Tip of piling was pre-sharpened; October 1977; USBR ...
    Citation