Search
You searched for:
Start Over
History
Remove constraint History
Subject
Caterpillar tractors
Remove constraint Subject: Caterpillar tractors
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
« Previous | 31 - 37 of 37 | Next »
Search Results
-
31. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No. 200C-842, Patterson Constr. Co., Contractor
CN-12-201-242NA Klamath Project - Oregon-California. View showing D-8 cat filling an open secondary drain. Note the smooth appearance of the portion of the drain that has been filled; February 1973; Bureau ...Citation -
32. [Image] Closed Drain Construction - Tule Lake Sump 3 - Specs. No, 200C-842, Patterson Constr. Co., Contractor
CN-12-201-241NA Klamath Project - Oregon-California. View of D-8 cat ripping frozen ground. During the coldest period, frost depths ranged from 3 inches to 12 inches below ground surface; February 1973; ...Citation -
33. [Image] Closed Drain Construction - Tule Lake Sump 3- Specs. No. 200C-842, Patterson Constr. Co., Contractor
CN-12-201-243NA Klamath Project - Oregon-California. View of D-8 cat smoothing and compacting drain that has just been filled; November 1972; Bureau of Reclamation photo by D. W. SteinCitation -
34. [Image] Clear Lake Spillway Rehabilitation - Specs. 200C-889 - Roy D. Garren Corporation, Contractor
P-12-200-2993NA Klamath Project - Oregon-California. View of caterpillar self-loading scraper, 35 cu. yd. capacity, loading earth material to be placed on dike; May 1974; Bureau of Reclamation photo ...Citation -
35. [Image] Clear Lake Spillway Rehabilitation - Specs. 200C-889 - Roy D. Garren Corporation, Contractor
P-12-200-2994NA Klamath Project - Oregon-California. Caterpillar, scraper self-loader, 35 cu. yd. capacity, unloading material on the dike; May 1974; Bureau of Reclamation photo by D. W. SteinCitation -
36. [Image] Lower Cost Canal Lining
KP-2191-R2--Lower Cost Canal Lining. Klamath Project. Sta. 150+00. M-2-a Lateral. D-8 Cat with dozer moving bank material from outer storage pile into compacted bank section; April 13, 1953; Bureau of ...Citation -
P12-201-4460 NA Klamath Project, OR-CA. View looking east. Pumping Plant EE--outlet transition material HD-5 Cat and laborer are standing on is imported 3/" minus with fines. This material is 1' deep. ...
Citation