Search
You searched for:
Start Over
History
Remove constraint History
Subject
Caterpillar tractors
Remove constraint Subject: Caterpillar tractors
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
Material Types
Image
Remove constraint Material Types: Image
« Previous | 1 - 10 of 37 | Next »
Search Results
-
KP-1519-R2 - Klamath Project. Looking north at Station 48-00; August 14, 1947; Photo by D. H. Gross
Citation -
2. [Image] TULE LAKE SUMP 3, Specs. DC-5621
P12-200-2661 - Klamath Project, California - TULE LAKE SUMP 3, Specs. DC-5621. N-12-b, Sta. 58. Cat 12 motor patrol finishing lateral prism; May 31, 1962; Photo by K.J. GreeneCitation -
3. [Image] Lower Cost Canal Lining
KP-2195-R2--Lower Cost Canal Lining. Klamath Project. M-2-a Lateral. Compacted earth lining. D-8 cat with dozer pulling in last lift for compacted bank; April 13, 1953; Bureau of Reclamation Photo by C. ...Citation -
P12-200-2886A Tule Lake Area - Sump 3 - Klamath Project - California. Baumgardner Excavating. Specs. No. 200C-778; November 1969; Bureau of Reclamation photo by J. B. Marcotte, Jr.
Citation -
P12-200-2887A Tule Lake Area - Sump 3 - Klamath Project - California. Baumgardner Excavating. Specs. No. 200C-778; November 1969; Bureau of Reclamation photo by J. B. Marcotte, Jr.
Citation -
P12-200-2940NA Klamath Project - Oregon-California. View of D-8 cat filling open secondary drain; November 1972; Bureau of Reclamation photo by D. W. Stein
Citation -
P12-200-2941NA Klamath Project - Oregon-California. Another view of a D-8 cat filling open secondary drain; December 1972; Bureau of Reclamation photo by D. W. Stein
Citation -
P12-200-2942NA Klamath Project - Oregon-California. A closer look at a D-8 cat filling an open secondary drain; December 1972; Bureau of Reclamation photo by D. W. Stein
Citation -
9. [Image] Lost River Diversion Channel - Picture shows construction of county road by cat and carryall
KP-1997-R2 - Klamath Project. Lost River Diversion Channel. Satisfactory compaction is obtained from weight of cat tracks and from pressure under the bid [sic -?] carryall tires. Sta. 360-00. Looking ...Citation -
KP-1998-R2 - Klamath Project. Lost River Diversion Channel. The machines are building and compacting foundation for county road. This will also serve as the south bank of the new Diversion Channel, Sta. ...
Citation