Search

Search Results

  • 155
    The scope of work of this study includes conceptual designs, corresponding capital cost estimates and engineering and construction schedules for two 50 MWe (net) commercial-scale geothermal power plants. ...
    Citation
  • 1100
    The Bureau of Mines conducted a series of in situ linear polarization measurements in high-temperature, high-pressure hypersaline geothermal brines at the Bureau of Mines Geothermal Test Facility in the ...
    Citation