P12-201-4549NA Klamath Project, OR-CA. Center Canal Flume Bridge. Wet area shows where unwanted jetting return was exiting into the west side of the drain on NE side of the flume; April 5, 1978; USBR ...
Citation -
P12-201-4550NA Klamath Project, OR-CA. Center Canal Flume Bridge. Lowered water level in flume. Refilled first jet return trench and dug a second deeper trench on an angle toward Pumping Plant E. These ...
Citation -
P12-201-4551NA Klamath Project, OR-CA. Center Canal Flume Bridge. Second return trench was cut into portions of the pile trench and worked well along with other measures to contain jet return; April ...
Citation -
P12-201-4553NA Klamath Project, OR-CA. Pumping Plant E Bridge. Contractor is moving bridge section laterally at this point; April 1978; USBR photo by D.J. Kline
Citation -
P12-201-4554NA Klamath Project, OR-CA. Pumping Plant E Bridge. Note that hillman rollers pivot for the turn under full load and with load stationary; April 1978; USBR photo by D.J. Kline
Citation -
P12-201-4555NA Klamath Project, OR-CA. Pumping Plant E Bridge. At this point contractor has travelled main traverse and is getting positioned to travel laterally with bridge section; April 1978; USBR ...
Citation -
P12-201-4556NA Klamath Project, OR-CA. Pumping Plant E Bridge. Tow line is hooked up to HD-5 cat to provide momentum to bridge section across main traverse; April 1978; USBR photo by D.J. Kline
Citation -
P12-201-4557NA Klamath Project, OR-CA. Pumping Plant E Bridge. Bridge section is in position over abutments and is jacked down onto bearing pads in stages; April 1978; USBR photo by D.J. Kline
Citation -
P12-201-4558NA Klamath Project, OR-CA. Pumping Plant E Bridge. Completed and ready for travel; May 1978; USBR photo by D.J. Kline
Citation -
P12-201-4575NA Klamath Project, OR-CA. Center Canal Flume Bridge. Assembly of 4 prestressed 11-ton concrete beams. Note dowels and Elasto Meric bearing pads in place (south abutment); April 21, 1978; ...
Citation