    KP-4 - Klamath Project. State Highway bridge at Station 73, showing Detour, light portion of bridge is extension, before paving applied. View looking Southwest; October 20, 1949; Photo by Andy Bergloff ...
    Citation
  • 3789
    P12-200-2783A Klamath River - Klamath Project--Oregon. This view shows flow conditions at point where Link River flows into Lake Ewauna, which is really the beginning of the Klamath River. Piers of new ...
    Citation
  • 3836
    P12-200-2827NA Flood Damage Repair in Langell Valley - Klamath Project- Oregon - California. Specs. 200C-591, Contractor - Patterson Construction Co.. Contractor's employee compacting backfill of wash ...
    Citation
  • 34. [Image] Lost River Repair
    3842
    P12-200-2832A Lost River Repair - Klamath Project - Oregon - California. Contractor's men shaping riprap on left abutment of bridge at Sta. 116+50 on Lost River, Specs. 200C-591. Contractor - Patterson ...
    Citation
  • 4618
    P12-201-4536NA Klamath Project, OR-CA. Plant E Bridge -- RHC personnel drilling out sheared slide bolts from Vulcan No. 1 hammer. Repairs took 14 man hours to complete; March 21, 1978; USBR photo by ...
    Citation
  • 4619
    P12-201-4537NA Klamath Project, OR-CA. Pumping Plant E -- SW corner of Plant E where water return was coming from pile driving jetting operations while working on west side of additional piling of ...
    Citation
  • 4622
    P12-201-4540NA Klamath Project, OR-CA. Plant E Outlet Transition Bridge -- Water flowing from base of the left retaining wall at Plant E. Flow was a by-product of jetting operations for Plant E west ...
    Citation
  • 4623
    P12-201-4541NA Klamath Project, OR-CA. Plant E. Outlet Transition Bridge -- View of Gorman-Rupp jetting pump imported by contractor. Note the undersized intake and exhaust fittings; March 20, 1978; USBR ...
    Citation
  • 4628
    P12-201-4546NA Klamath Project, OR-CA. Center Canal Flume Bridge. For safety of flume, water jet return trench was excavated from east side of pile trench to KSD. No jetting return was evident in flume ...
    Citation
  • 4629
    P12-201-4547NA Klamath Project, OR-CA. Center Canal Flume Bridge. Jet trench excavated on north side of flume, same design as south side return trench. This trench did not work, however, as jetting ...