P12-201-4545NA Klamath Project, OR-CA. Center Canal Flume Bridge. Photo taken from south side of flume where the bridge crosses, looking to the NW of flume inlet. Note water surface and disturbance on ...
Citation -
P12-201-4546NA Klamath Project, OR-CA. Center Canal Flume Bridge. For safety of flume, water jet return trench was excavated from east side of pile trench to KSD. No jetting return was evident in flume ...
Citation -
P12-201-4547NA Klamath Project, OR-CA. Center Canal Flume Bridge. Jet trench excavated on north side of flume, same design as south side return trench. This trench did not work, however, as jetting ...
Citation -
P12-201-4548NA Klamath Project, OR-CA. Center Canal Flume Bridge. Photo taken from north looking south of flume bridge area. An apparent slip fault was noted where shovel is standing between flume north ...
Citation -
P12-201-4549NA Klamath Project, OR-CA. Center Canal Flume Bridge. Wet area shows where unwanted jetting return was exiting into the west side of the drain on NE side of the flume; April 5, 1978; USBR ...
Citation -
P12-201-4550NA Klamath Project, OR-CA. Center Canal Flume Bridge. Lowered water level in flume. Refilled first jet return trench and dug a second deeper trench on an angle toward Pumping Plant E. These ...
Citation -
P12-201-4551NA Klamath Project, OR-CA. Center Canal Flume Bridge. Second return trench was cut into portions of the pile trench and worked well along with other measures to contain jet return; April ...
Citation -
P12-201-4575NA Klamath Project, OR-CA. Center Canal Flume Bridge. Assembly of 4 prestressed 11-ton concrete beams. Note dowels and Elasto Meric bearing pads in place (south abutment); April 21, 1978; ...
Citation -
P12-201-4576NA Klamath Project, OR-CA. Center Canal Flume Bridge. Setting of first section of bridge; April 21, 1978; USBR photo by D.J. Kline
Citation -
P12-201-4577NA Klamath Project, OR-CA. Center Canal Flume Bridge. 3500 Manitowoc handled the 11-ton bridge deck load with no problems; April 21, 1978; USBR photo by D.J. Kline