    P12-201-4433 NA Klamath Project, OR-CA. Ady Canal--View looking east through completed tunnel liner; August 19, 1977; USBR photo by D.J. Kline
    Citation
  • 4516
    P12-201-4434 NA Klamath Project, OR-CA. Ady Canal--View looking east across Hwy 97 over tunnel site. Depression caused by shoring failure is visible on far side of road surface; August 19, 1977; USBR ...
    Citation
  • 4535
    P12-201-4453 NA Klamath Project, OR-CA. Ady Canal--Shows 84" CMP Joint as made up by RHC. Joint is on west end of Mitered Bend. Note: how pipe is not set true. Armco, the pipe manufacturer, is to come ...
    Citation
  • 4537
    P12-201-4455 NA Klamath Project, OR-CA. Ady Canal--View of siphon pipe laying operation looking from hwy. west toward RR. Pettibone 30 Multicrane used for lifting; September 1977; USBR photo by D.J. ...
    Citation
  • 4547
    P12-201-4465 NA Klamath Project, OR-CA. Ady Canal, U.S. Hwy 97 & SP RR siphon--view looking west upstream end of 84" CAP at Hwy 97. View shows bulkhead that was constructed by contractor for use in ...
    Citation
  • 4549
    P12-201-4467 NA Klamath Project, OR-CA. Ady Canal--west end of excavation for siphon inlet transition. Depth is approx. 2.0 ft below subgrade. Note: Free water being pumped out by small 3/" electric ...
    Citation
  • 4550
    P12-201-4468 NA Klamath Project, OR-CA. Ady Canal--view looking SE at siphon inlet transition. View shows RE-Steel for slab area is about all in place and tied; October 1977; USBR photo by D.W. Stein ...
    Citation
  • 4551
    P12-201-4469 NA Klamath Project, OR-CA. Ady Canal--view looking east at siphon inlet transition slab area. Concrete has just been placed for slab area and is in process of being covered, for cold weather ...
    Citation
  • 4553
    P12-201-4471 NA Klamath Project, OR-CA. Ady Canal -- Concrete is being placed in slab of inlet into syphon. Concrete is wet batched from CPI plant from Klamath Falls, OR. It is hauled out to job site in ...
    Citation
  • 4510
    P12-201-4429 NA Klamath Project, OR-CA. Ady Canal, U.S. Hway 97 and SPRR siphon--View looking east of west portal of tunnel under Hwy 97. Bobcat loader. Contractor's ventilation system and channel iron ...
    Citation