Search
You searched for:
Start Over
History
Remove constraint History
Subject
Ady Canal (Oregon)
Remove constraint Subject: Ady Canal (Oregon)
Subject
Highway 97 (U.S.)
Remove constraint Subject: Highway 97 (U.S.)
Subject
Irrigation canals and flumes -- Design and construction
Remove constraint Subject: Irrigation canals and flumes -- Design and construction
Material Types
Image
Remove constraint Material Types: Image
1 - 2 of 2
Search Results
-
P12-201-4431 NA Klamath Project, OR-CA. Ady Canal--Initial shoring installed to prevent further failure of the east shoring at Hwy 97. This was installed on Aug. 17 prior to the tunnel shield fully exiting ...
Citation -
P12-201-4434 NA Klamath Project, OR-CA. Ady Canal--View looking east across Hwy 97 over tunnel site. Depression caused by shoring failure is visible on far side of road surface; August 19, 1977; USBR ...
Citation