Search

You searched for: Start Over Photos Remove constraint Photos Author Westphal, Donald M. Remove constraint Author: Westphal, Donald M.

Search Results

  • 1. [Image] Gerber Dam
    3064
    KP-2213-R2 - Klamath Project, Gerber Dam. View showing spalled condition of walkway on right abutment of dam. This is one season's accumulation of spall. California Projects; July 14, 1953; Photo by Donald ...
    Citation
  • 3075
    KP-2215-R2 - Klamath Project, Gerber Dam. Downstream face of spillway showing leaks from construction joints and water flowing along downstream face of dam. California Projects; July 14, 1953; Photo by ...
    Citation
  • 3076
    KP-2216-R2 - Klamath Project, Gerber Dam. View of left closure slot showing condition of concrete. California Projects; July 14, 1953; Photo by Donald M. Westphal
    Citation
  • 3077
    KP-2217-R2 - Klamath Project, Malone Diversion Dam. View of downstream face of radial gates. Note disintegrated condition of concrete near bottom of retaining wall and separation of concrete in right wing ...
    Citation
  • 5. [Image] Clear Lake Dam
    3078
    KP-2218-R2 - Klamath Project, Clear Lake Dam. View of upstream face of dam. California Projects; July 15, 1953; Photo by Donald M. Westphal
    Citation
  • 6. [Image] Clear Lake Dam
    3079
    KP-2219-R2 - Klamath Project, Clear Lake Dam. General view of downstream face of the dam. California Projects; July 15, 1953; Photo by Donald M. Westphal
    Citation
  • 7. [Image] Clear Lake Dam
    3080
    KP-2220-R2 - Klamath Project, Clear Lake Dam. Spillway and gatetender's quarters. Metal building at left houses the stop logs for the spillway. California Projects; July 15, 1953; Photo by Donald M. We...
    Citation
  • 3081
    KP-2221-R2 - Klamath Project, Clear Lake Dam. Outlet gates are satisfactorily operated with a 42-inch ratchet wrench which was provided in lieu of the recommended 5-foot dia. spoked handwheel. California ...
    Citation
  • 3082
    KP-2222-R2 - Klamath Project, Clear Lake Dam. Outlet works gate structure showing condition of the concrete. California Projects; July 15, 1953; Photo by Donald M. Westphal
    Citation
  • 3083
    KP-2223-R2 - Klamath Project, Lower Lost River Diversion Dam. View of canal bank successfully repaired and stabilized by paving and installation of underdrains under the concrete lining. California Projects; ...
    Citation