Search
You searched for:
Start Over
Photos
Remove constraint Photos
Author
Wamstad, C. O.
Remove constraint Author: Wamstad, C. O.
« Previous | 71 - 80 of 84 | Next »
Search Results
-
71. [Image] Pumping Plant "F", Unit 1
KP-2125-R2 - Klamath Project. Pumping Plant "F", Unit 1. Stilling well boxes installed by representative of Economy Pump, Inc. View from hatch in pump floor. Turbulence of water can be noted; June 13, ...Citation -
72. [Image] Lost River Channel Improvement, Langell Valley
KP-2162-R2 - Klamath Project. Lost River Channel Improvement, Langell Valley. General view of right bank looking downstream form Station 223+50. Picture shows large existing west bank in center foreground ...Citation -
73. [Image] Lost River Channel Improvement, Langell Valley
KP-2164-R2 - Klamath Project. Lost River Channel Improvement, Langell Valley. Looking upstream along west bank from Station 246+00, showing draglines excavating channel. Old drain can be seen behind draglines. ...Citation -
74. [Image] Southwest Sump Dikes
2179-R2 - Southwest Sump Dikes. Klamath Project, Oregon-California. Station 44 looking north. Unfinished back slope which was wetter material placed direct from toe drain to dragline 38-B. Top portion ...Citation -
75. [Image] Pumping Plant "F"
KP-2121-R2 - Klamath Project. Pumping Plant "F". View of outlet structure and back of pumping plant showing installation of stilling well for check tests on Unit 1; June 13, 1952; Photo by C. O. Wamsta...Citation -
76. [Image] Lost River Channel Improvement, Langell Valley
KP-2160-R2 - Klamath Project. Lost River Channel Improvement, Langell Valley. General view looking downstream from Station 235+50 on left bank. Right-of-way being prepared to hold wet excavation material ...Citation -
77. [Image] Lost River Channel Improvement, Langell Valley
KP-2165-R2 - Klamath Project. Lost River Channel Improvement, Langell Valley. General view looking upstream from Station 223+50. Picture shows old existing spoil banks and drain. McKinnon Construction ...Citation -
78. [Image] Link River Dam
KP-2188-R2 - Klamath Project. Link River Dam. River Outlet Stilling Basin. General view of diffuser blocks. Personnel from The California-Oregon Power Company are: Gilbert W. Fleet, Ass't Supt., Marion ...Citation -
79. [Image] Lower Cost Canal Lining, Klamath Project
KP-2194-R2--Lower Cost Canal Lining, Klamath Project. M-2-a Lateral. Compacted earth lining. Looking upstream from Sta. 137+50. 18-ft. Bottom; two 6-inch layers in place; March 29, 1953; Bureau of Reclamation ...Citation -
80. [Image] KP-2196-R2--Lower Cost Canal Lining
KP-2196-R2--Lower Cost Canal Lining. Klamath Project. M-2-a-1 Lateral. Bottom of ditch, after standing from fall until spring, opened up for compacted earth lining. Discing to mix top, dry material with ...Citation