« Previous | 1 - 10 of 11 | Next »
Search Results
-
1. [Image] Lower Cost Canal Lining
KP-2190-R2--Lower Cost Canal Lining. Klamath Project. M-2-a Lateral. Flat-iron roller which has five 18" X 16" airplane tires. Used in compacting earth lining; April 13, 1953; Bureau of Reclamation Photo ...Citation -
2. [Image] Lower Cost Canal Lining, Klamath Project
KP-2193-R2--Lower Cost Canal Lining, Klamath Project. M-2-a Lateral, Station 150+00. General view of grader and rollers constructing compacted banks; April 13, 1953; Bureau of Reclamation Photo by C. O. ...Citation -
3. [Image] Lower Cost Canal Lining
KP-2195-R2--Lower Cost Canal Lining. Klamath Project. M-2-a Lateral. Compacted earth lining. D-8 cat with dozer pulling in last lift for compacted bank; April 13, 1953; Bureau of Reclamation Photo by C. ...Citation -
4. [Image] Lower Cost Canal Lining, Klamath Project
KP-2197-R2--Lower Cost Canal Lining, Klamath Project. M-2-a Lateral. Compacted earth lining. Looking downstream from Sta. 143+00. Bottom section after winter's weathering; March 29, 1953; Bureau of Reclamation ...Citation -
5. [Image] Lower Cost Canal Lining
KP-2199-R2--Lower Cost Canal Lining. Klamath Project. M-2-a-1 Lateral. End of 30-inch over-excavated section for compacted earth lining showing also, undisturbed ditch; April 13, 1953; Bureau of Reclamation ...Citation -
6. [Image] Lower Cost Canal Lining, Klamath Project
KP-2192-R2--Lower Cost Canal Lining, Klamath Project. M-2-a Lateral, Station 150+00. General view of grader and rollers constructing compacted banks. Next-to-last lift; April 13, 1953; Bureau of Reclamation ...Citation -
7. [Image] Lower Cost Canal Lining
KP-2200-R2--Lower Cost Canal Lining. Klamath Project. M-2-a Lateral. Compacted Earth lining. 13-wheels- 6 front, 7 back. Wobble wheel rollers; April 13, 1953; Bureau of Reclamation Photo by C. O. Wamst...Citation -
8. [Image] Lower Cost Canal Lining, Klamath Project
KP-2194-R2--Lower Cost Canal Lining, Klamath Project. M-2-a Lateral. Compacted earth lining. Looking upstream from Sta. 137+50. 18-ft. Bottom; two 6-inch layers in place; March 29, 1953; Bureau of Reclamation ...Citation -
9. [Image] KP-2196-R2--Lower Cost Canal Lining
KP-2196-R2--Lower Cost Canal Lining. Klamath Project. M-2-a-1 Lateral. Bottom of ditch, after standing from fall until spring, opened up for compacted earth lining. Discing to mix top, dry material with ...Citation -
10. [Image] Lower Cost Canal Lining
KP-2198-R2--Lower Cost Canal Lining. Klamath Project. M-2-a Lateral. P&H 255, 3/4-Yd. Dragline shaping up bank of lateral. Compacted earth lining in immediate foreground. Other bank has been completed ...Citation