Search
You searched for:
Start Over
Dams
Remove constraint Dams
Author
Wamstad, C. O.
Remove constraint Author: Wamstad, C. O.
Subject
Gerber Dam (Oregon)
Remove constraint Subject: Gerber Dam (Oregon)
Material Types
Image
Remove constraint Material Types: Image
« Previous | 1 - 10 of 15 | Next »
Search Results
-
1. [Image] Gerber Dam
KP-2148-R2 - Klamath Project. Gerber Dam. Downstream face of dam as seen from right abutment, showing seepage from closure joint at far side of spillway; August 21, 1952; Photo by C. O. WamstadCitation -
2. [Image] Gerber Dam
KP-2242-R2 - Klamath Project--Gerber Dam. General downstream view showing old existing outlet channel along the face of dam; May 26, 1954; Photo by C. O. WamstadCitation -
3. [Image] Gerber Dam - Outlet Channel
KP-2243-R2 - Klamath Project--Gerber Dam. Outlet Channel where it had washed back against the face of the dam below the spillway; May 26, 1954; Photo by C. O. WamstadCitation -
KP-2247-R2 - Klamath Project--Gerber Dam. General view of gate house, pool and new channel constructed below dam; November 12, 1954; Photo by C. O. Wamstad
Citation -
KP-2248-R2 - Klamath Project--Gerber Dam. General view of gate house, looking into pool below valve house from top of dam; November 12, 1954; Photo by C. O. Wamstad
Citation -
6. [Image] Gerber Dam - Deepest part of pool
KP-2254-R2 - Klamath Project--Gerber Dam. Deepest part of pool below center part of spillway - about 4' deep. Shows no erosion of concrete on face of dam; November 12, 1954; Photo by C. O. WamstadCitation -
7. [Image] Gerber Dam
KP-2104-R2 - Klamath Project. Gerber Dam. Coating of construction joints upstream face with Neoprene material. Center portion of spillway section; October 1951; Photo by C. O. WamstadCitation -
8. [Image] Gerber Dam
KP-2105-R2 - Klamath Project. Gerber Dam. Coating of construction joints upstream face with Neoprene material. Closure slot left side of spillway; October 1951; Photo by C. O. WamstadCitation -
9. [Image] Gerber Dam - Outlet pool below gate house
KP-2244-R2 - Klamath Project--Gerber Dam. Outlet pool below gate house - Gate No. 2 open 1.6 feet. Discharge 179 c.f.s.; May 26, 1954; Photo by C. O. WamstadCitation -
KP-2249-R2 - Klamath Project--Gerber Dam. General view of downstream face of gate structure, gates in closed position and unwatered pool; November 12, 1954; Photo by C. O. Wamstad
Citation