Search
You searched for:
Start Over
Photos
Remove constraint Photos
Author
United States. Bureau of Reclamation
Remove constraint Author: United States. Bureau of Reclamation
« Previous | 2,611 - 2,620 of 3,876 | Next »
Search Results
-
P-12-200-4027 NA Klamath Project, California-Oregon. The feature regulates flow from the Upper Klamath Lake Reservoir. It is a principal source of water supply for the project. The dam is a reinforced ...
Citation -
2612. [Image] Fire Damage to Project Office - August 10, 1975
P-12-200-4034NA Klamath Project - Oregon. Photo shows destruction of two calculators and desk in construction work room (Room 14) where consideraqble amount of files, survey notes, and working drawings ...Citation -
2613. [Image] Link River Dam
KP-2183-R2 - Klamath Project. Link River Dam. Close-up view finishes panorama of old apron on downstream side of the river gate section. Picture was taken from within stilling basin. Construction by The ...Citation -
2614. [Image] Link River Dam
KP-2184-R2 - Klamath Project. Link River Dam. View of existing concrete apron of river gate section, also the agglomerate foundation material underneath apron. Looking upstream at almost the entire river ...Citation -
2615. [Image] Link River Dam
KP-2185-R2 - Klamath Project. Link River Dam. View of river gate section stilling basin which is under construction by The California-Oregon Power Company. Picture was taken from southeast side of excavation ...Citation -
2616. [Image] Link River Dam
KP-2188-R2 - Klamath Project. Link River Dam. River Outlet Stilling Basin. General view of diffuser blocks. Personnel from The California-Oregon Power Company are: Gilbert W. Fleet, Ass't Supt., Marion ...Citation -
2617. [Image] Lower Cost Canal Lining, Klamath Project
KP-2194-R2--Lower Cost Canal Lining, Klamath Project. M-2-a Lateral. Compacted earth lining. Looking upstream from Sta. 137+50. 18-ft. Bottom; two 6-inch layers in place; March 29, 1953; Bureau of Reclamation ...Citation -
2618. [Image] KP-2196-R2--Lower Cost Canal Lining
KP-2196-R2--Lower Cost Canal Lining. Klamath Project. M-2-a-1 Lateral. Bottom of ditch, after standing from fall until spring, opened up for compacted earth lining. Discing to mix top, dry material with ...Citation -
2619. [Image] Lower Cost Canal Lining
KP-2198-R2--Lower Cost Canal Lining. Klamath Project. M-2-a Lateral. P&H 255, 3/4-Yd. Dragline shaping up bank of lateral. Compacted earth lining in immediate foreground. Other bank has been completed ...Citation -
2620. [Image] Lower Cost Canal Lining
KP-2191-R2--Lower Cost Canal Lining. Klamath Project. Sta. 150+00. M-2-a Lateral. D-8 Cat with dozer moving bank material from outer storage pile into compacted bank section; April 13, 1953; Bureau of ...Citation