KP-15 - Aerial Photograph of the Proposed Lower Lost River Channel Improvement. The white line entering the picture at lower right is the west end of the North Main Dike and where it extends vertically ...
Citation -
2432. [Image] Upstream face and inlet transition to weir, just below outlet to tunnel from Pumping Plant "D"
KP-1928 - Klamath Project. Set-up was made for testing of Worthington Units 4 and 5 of Pumping Plant "D"; March 16, 1950; Photo by Mark D. Taylor, Jr.Citation -
2433. [Image] Lower Cost Canal Lining - Picture taken at 100-Drain
KP-1929 - Klamath Project. Lower Cost Canal Lining. Wasteway of the N-16 Lateral showing method of laying asphalt. Pipe through center of roll is used to carry roll up side of bank; March 29, 1950; Photo ...Citation -
2434. [Image] Lost River Channel Improvement, Langell Valley
KP-1944 - Klamath Project. Lost River Channel Improvement, Langell Valley. Bridge at cheese factory just before the replacement of piling. C. O. Wamstad and Hugh P. Crawford, inspecting. Government ...Citation -
2435. [Image] Lost River Channel Improvement, Langell Valley
KP-1945 - Klamath Project. Lost River Channel Improvement, Langell Valley. Picture of bridge at Sta. 454-01 on Lost River just before replacement of piling. Picture taken from northwest side of Bridge. ...Citation -
2436. [Image] Lost River Channel Improvement, Langell Valley
KP-1946 - Klamath Project. Lost River Channel Improvement, Langell Valley. Structure 14, Specs. 2578, 36" x 30' corrugated metal pipe. Picture shows headwall and rock paving; May 15, 1950; Photo by ...Citation -
2437. [Image] Lost River Channel Improvement, Langell Valley
KP-1947 - Klamath Project. Lost River Channel Improvement, Langell Valley. Picture of bridge, located at Sta. 454-01 on Lost River. Picture taken just previous to the replacement of piling. Test drive ...Citation -
2438. [Image] Lower Lost River Channel Improvement
KP-1951 - Klamath Project. Lower Lost River Channel Improvement. Picture shows condition of North Main Dike, also farm land which runs to edge of 40-B Drain; June 5, 1950; Photo by Andrew M. Bergloff...Citation -
2439. [Image] Lower Lost River Diversion Dam - Protective wall to J-canal wingwall showing outlet pipes for internal drainage and seepage
KP-1968-Klamath Project. Lower Lost River Diversion Dam. Picture taken 75 feet from protective wall just below dam apron looking north. Andrew M. Bergloff, Photo. June 8, 1950.Citation -
2440. [Image] Lower Lost River - Preconstruction picture
KP-2080-R2 - Klamath Project. Lower Lost River. Picture shows outlet pipe of Pumping Plant No. 1 as it projects almost entirely above bottom grade of J-3 Lateral. Rocks have been thrown into lateral ...Citation