P12-201-4520 NA Klamath Project, OR-CA. Ady Siphon -- View of south wall of siphon inlet transition and portion of backfill over 84-inch RCP; February 28, 1978; USBR photo by D.J. Kline
Citation -
P12-201-4523 NA Klamath Project, OR-CA. Plant FF No. 3 bay, between elev. A and B decks. Note effect of cleanup and also newly painted exterior surfaces of pump bowl and lower column; March 3, 1978; USBR ...
Citation -
P12-201-4526 NA Klamath Project, OR-CA. View of trashracks at Plant FF. Note color range from dark to light. The lighter color is phenolic aluminum paint added to protect coal tar epoxy from sunlight; ...
Citation -
P12-201-4528 NA Klamath Project, OR-CA. Cold weather protection that was installed for painting Plant FF pump units and also utilized for dressing up face of wall where spillage occurred when placing deck ...
Citation -
P12-201-4531 NA Klamath Project, OR-CA. View shows open gates on Ady Canal after they had been closed to make 84" RCP crossing under Straits Drain; February 1978; USBR photo by D.J. Kline
Citation -
P12-201-4532 NA Klamath Project, OR-CA. View of 8" pipe being removed due to bolts breaking at connection to 84" RCP (seen at the bottom). This had been completely backfilled and Constr. Inspector (D.W. ...
Citation -
P12-201-4533 NA Klamath Project, OR-CA. Pumping Plant FF -- View showing 3500 Manitowoc completing the connection of Klamath Straits Drain to Plant FF's inlet; March 13, 1978; USBR photo by D.J. Kline
Citation -
P12-201-4534 NA Klamath Project, OR-CA. Pumping Plant EE -- Plant E bridge piling at a depth of 39 feet after nearly 2 days' work. Note water jet at this time consisted of 3/4" steel pipe with Gorman Rupp ...
Citation -
P12-201-4536NA Klamath Project, OR-CA. Plant E Bridge -- RHC personnel drilling out sheared slide bolts from Vulcan No. 1 hammer. Repairs took 14 man hours to complete; March 21, 1978; USBR photo by ...
Citation -
P12-201-4537NA Klamath Project, OR-CA. Pumping Plant E -- SW corner of Plant E where water return was coming from pile driving jetting operations while working on west side of additional piling of ...