KP-2063-R2 - Klamath Project. Lost River Diversion Channel Control Structure and Railroad Bridge. Close-up of pier showing 3/4" dowels and prepared concrete face. While driving piling, the concrete ...
Citation -
2042. [Image] PUMPING PLANT 9, Tule Lake Sump 2
KP-2544-R2- Klamath Project - PUMPING PLANT 9, Tule Lake Sump 2. Looking north to plant intake. The high motor deck is required when Sump 2 is flooded in years of high runoff; December 26, 1959; Photo ...Citation -
2043. [Image] PUMPING PLANT 9, Tule Lake Sump 2
KP-2545-R2-Klamath Project - PUMPING PLANT 9, Tule Lake Sump 2. View of pumping units taken from bridge deck. Units are 25 cfs capacity at 15 feet head; December 26, 1959; Photo by K.J. GreeneCitation -
2044. [Image] PUMPING PLANT 9, Tule Lake Sump 2
KP-2546-R2-Klamath Project - PUMPING PLANT 9, Tule Lake Sump 2. View of motor deck. Motors are 60 H.P. Deck can be removed to permit removal of pumping units with mobile crane. Mr. Hunsicker of Mechanical ...Citation -
2045. [Image] PUMPING PLANT 9, Tule Lake Sump 2
KP-2547-R2-Klamath Project - PUMPING PLANT 9, Tule Lake Sump 2. View looking south, showing 30" diameter discharge lines and walkway. Walkway provides easy access from dike for plant operation and is necessary ...Citation -
2046. [Image] Sump 3, 101-C-6 Drain
KP-2549-R2-Klamath Project - Sump 3, 101-C-6 Drain. View showing excavation of top two feet with carryalls near station 66+00 by subcontractor D.Potter & Co. Carryalls are Hancock 7E2 selfloading, powered ...Citation -
2047. [Image] Sump 3, 101-C-6 Drain
KP-2550-R2-Klamath Project - Sump 3, 101-C-6 Drain. View showing second stage in drain excavation. Construction of field dike, shaping of east side of drain done by Tulelake Irrigation District gradall ...Citation -
2048. [Image] SUMP 3, 101-C-6 Drain
KP-2551-R2- Klamath Project - SUMP 3, 101-C-6 Drain. View showing final step in drain excavation. Tule Lake's Irrigation District's one-cubic-yard dragline is excavating complete section near Station 84+00; ...Citation -
2049. [Image] TULE LAKE DIVISION - Pumping Plant T
KP-2553-R2-Klamath Project - TULE LAKE DIVISION - Pumping Plant T. View looking northwest to inlet. Plant serves 3 farm units and was constructed in 1956. Capacity is 9 cfs at 8' head. Bypass valve permits ...Citation -
KP-2554-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248 - Q-Canal. TD-18 Tractor and 4'x4' dual drum sheepsfoot roller compacting canal lining, bottom of Q-Canal, Station 38+00; ...