Search Results
-
KP-1097-R2 - Klamath Project - Tule Lake Division - Modoc Unit - Klamath Straits Drain Outlet - View from northwest of barn located partially within the right-of-way required for the drain ditch on the ...
Citation -
1862. [Image] Pumping Plant A - showing subsurface conditions in Southeast corner of excavation for the plant
KP-1099-R2 - Klamath Project. Vertical cracks, varying in width up to 3" form subterranean channels for flow of water. Approximately 1/4 sec. ft. of water is shown flowing from the crack. The top surface ...Citation -
1863. [Image] TULE LAKE SUMP 3, Specs. DC-5621
P12-200-2662 - Klamath Project, California - TULE LAKE SUMP 3, Specs. DC-5621. N-12-b Lateral, Sta. 54. 1 1/2 cu yard Link Belt Dragline building normal bank on top of lining. Material will be smoothed ...Citation -
1864. [Image] P12-200-2663 - Klamath Project, California - TULE LAKE SUMP 3, 101-Drain north of Pumping Plant 10
P12-200-2663 - Klamath Project, California - TULE LAKE SUMP 3, 101-Drain north of Pumping Plant 10. View looking north, pump has drawn down existing drain removing old silt deposits; June 2, 1962; Photo ...Citation -
P12-200-2783A Klamath River - Klamath Project--Oregon. This view shows flow conditions at point where Link River flows into Lake Ewauna, which is really the beginning of the Klamath River. Piers of new ...
Citation -
P12-200-2788A Klamath River - Klamath Project--Oregon. This view of Baldwin residence (wild duck farm) shows level of high water from river and, also, runoff from adjoining land flooding around residence ...
Citation -
P12-200-2791A Klamath River - Klamath Project--Oregon. Employees of M-K Co., under contract with PP&L Co., drilling rock and placing explosive for excavation of 100' X 12' X 3500' channel through Keno ...
Citation -
1868. [Image] Klamath River - Employees of M-K Co. placing explosive in middle reach of by-pass channel
P12-200-2792A Klamath River - Klamath Project--Oregon. Channel is to be 12 feet deep, about two thirds in rock. River channel is at right of picture. Note dewatering pump in far background; March 3, ...Citation -
1869. [Image] Klamath River - View from existing Keno regulating dam
P12-200-2793A Klamath River - Klamath Project--Oregon. View from existing Keno regulating dam showing M-K Co. dragline removing blasted rock from by-pass channel. Equipment at right is on old spoil pile, ...Citation -
1870. [Image] Klamath River - View east, upstream, from existing Keno regulating dam showing beginning of excavation
P12-200-2794A Klamath River - Klamath Project--Oregon. Trench is to drain overburden to facilitate excavation; March 3, 1965; Bureau of Reclamation photo by C. D. LawrenceCitation