Search
You searched for:
Start Over
Photos
Remove constraint Photos
Author
United States. Bureau of Reclamation
Remove constraint Author: United States. Bureau of Reclamation
« Previous | 1,651 - 1,660 of 3,876 | Next »
Search Results
-
1651. [Image] TULE LAKE DIVISION - Sump 2
KP-2386-R2 - Klamath Project--TULE LAKE DIVISION. Experimental drain about 300' south of pumping plant, looking N.W. to dragline which has been excavating material pushed up in bottom of drain. Bank has ...Citation -
1652. [Image] TULE LAKE DIVISION - Sump 2
KP-2388-R2 - Klamath Project--TULE LAKE DIVISION. Experimental drain about 300' south of pumping plant. Looking south to new bank subsidence in foreground and showing bank subsidence in backgroud which ...Citation -
KP-2392-R2 - Klamath Project--ENTERPRISE POWER PLANT. Fire in 1956 damaged the power house and the turbine is not in operation. Water for irrigation flows through the power house structure and bypass. ...
Citation -
1654. [Image] TULE LAKE SUMP 2
KP-2396-R2 - Klamath Project--TULE LAKE SUMP 2. Drainage pumping plant constructed by Lessees for pumping from leases to Sump 1. Structural and foundation failure due to lack of structure to resist earth ...Citation -
1655. [Image] Lower Klamath Lake north bank of Lot 19 Lease Area "K"
KP-2398-R2 - Klamath Project - Lower Klamath Lake north bank of Lot 19 Lease Area "K". General view of north dike of lot 19 facing east showing headgates of pipe through dike. Shovel is on outlet of second ...Citation -
1656. [Image] Lower Klamath Lake north bank of lot 19 Lease Area "K"
KP-2399-R2 - Klamath Project - Lower Klamath Lake north bank of lot 19 Lease Area "K". Close up view showing the threatened break at the turnout pipes placed by Dan O'Conner to provide water through the ...Citation -
1657. [Image] CLEAR LAKE - Underwater soil sampling raft
KP-2402-R2 - CLEAR LAKE - Klamath Project. Soil sampling procedure. Veimeir soil sampling tube, about 1 1/8" in diameter being driven into soil on bottom of Clear Lake. The tube is inside 3" pipe which ...Citation -
1658. [Image] CLEAR LAKE - Underwater soil sampling procedure
KP-2404-R2 - CLEAR LAKE - Klamath Project. Pumping air into bottom section of vehmeir tube to extrude soil sample. Winch at right is used to lower and raise 3" pipe in center of raft. Small winch at corner ...Citation -
1659. [Image] LANGELL VALLEY - Improved Lost River Channel Station 486
KP-2407-R2 - LANGELL VALLEY - Klamath Project. Drainage inlet culvert on northeast side of channel. Looking southwest, showing fill over inlet which was washed away during flood of January 1956; October ...Citation -
1660. [Image] TULELAKE IRRIGATION DISTRICT - Small pumping plant
KP-2408-R2 - TULELAKE IRRIGATION DISTRICT - Klamath Project. Small pumping plant which pumps water from No. 45 drain into J-11 lateral. This type is called a "box pump" locally. The vertical column is ...Citation