Search

You searched for: Start Over Photos Remove constraint Photos Author United States. Bureau of Reclamation Remove constraint Author: United States. Bureau of Reclamation

Search Results

  • 3418
    P12-200-2713 - Klamath Project - TULE LAKE SUMP 2 - Specifications. No. 200C-519 - Q-2 Lateral. View looking east showing lateral being filled for first time after raising banks; March 28, 1963; Photo ...
    Citation
  • 3422
    P12-200-2717 - Klamath Project - KLAMATH PROJECT EXTENSIONS - Klamath Basin Improvement District Contract - Stukel Pumping Plant. View looking south showing outlet structre in "G" Canal. Note workmen ...
    Citation
  • 3423
    P12-200-2718 - Klamath Project - KLAMATH PROJECT EXTENSIONS - Klamath Basin Improvement District Contract - "G" Canal Enlargement. View looking east showing "G" Canal immediately downstream from Stukel ...
    Citation
  • 3424
    P12-200-2719 - Klamath Project - KLAMATH PROJECT EXTENSIONS - Klamath Basin Improvement District Contract - Poe Valley Pumping Plant. View looking north showing outlet structure in "F" Canal; April 5, ...
    Citation
  • 3425
    P12-200-2720 - Klamath Project - Tule Lake Sump 2 - Q-1 Lateral, Station 13. View of left bank and farm turnout constructed two years ago. Note extent of exposure of cut stake hubs which at the time of ...
    Citation
  • 3426
    P12-200-2721 - Klamath Project - TULE LAKE SUMP 2 - Staff Gage "A", 102-D Drain, Station 40+20. View of one of the nineteen staff gages which were installed for drainage investigations; May 3, 1963; Photo ...
    Citation
  • 1597. [Image] DAMAGED OLENE FLUME
    3430
    P12-200-2725 - Klamath Project - DAMAGED OLENE FLUME - View inside 10' diameter semi-circular section looking east in direction of flow. Note several sheet metal sections and the joins were displaced by ...
    Citation
  • 1598. [Image] DAMAGED OLENE FLUME
    3431
    P12-200-2726 - Klamath Project - DAMAGED OLENE FLUME - View from deck looking down, about 35° from vertical, upon hole torn in 14 gage galvanized steel flume section. Opening torn by dynamite blast is ...
    Citation
  • 3432
    P12-200-2727 - Klamath Project - KLAMATH STRAITS DRAIN - Middle Canal Flume repair, Specs. No. 201C-3(SF). View of raised concrete walls just completed by contract. Note "slough in" caused by overflow ...
    Citation
  • 3442
    P12-200-2737 - Klamath Project - EXTENSIONS DEDICATION AT STUKEL PUMPING PLANT. Visiting dignitaries on stand included Commissioner Floyd E. Dominy, U.S. Senator Wayne Morse, U.S. Representative Al Ullman, ...
    Citation