Search
You searched for:
Start Over
Land use history
Remove constraint Land use history
Author
United States. Bureau of Reclamation
Remove constraint Author: United States. Bureau of Reclamation
Material Types
Image
Remove constraint Material Types: Image
« Previous | 231 - 240 of 270 | Next »
Search Results
-
231. [Image] Clear Lake Spillway Rehabilitation - Specs. 200C-889 - Roy D. Garren Corporation, Contractor
P-12-200-3023NA Klamath Project - Oregon-California. View of equipment used to drill the drainage holes. A Chicago Pneumatic #55 drill was mounted on the side of a 977-K Loader bucket; July 1974; USBR ...Citation -
232. [Image] Clear Lake Spillway Rehabilitation - Specs. 200C-889 - Roy D. Garren Corporation, Contractor
P-12-200-3025NA Klamath Project - Oregon-California. View of contractor's men and equipment drilling a drainage hole in spillway crest area. A #55 Chicago pneumatic drill was used for this work; July ...Citation -
233. [Image] Clear Lake Spillway Rehabilitation - Specs. 200C-889 - Roy D. Garren Corporation, Contractor
P-12-200-3033NA Klamath Project - Oregon-California. View of borrow area before borrowing operations were begun. The borrow was used as rock backfill. Bill Long, Contractor's foreman, is in background; ...Citation -
234. [Image] Clear Lake Spillway Rehabilitation - Specs. 200C-889 - Roy D. Garren Corporation, Contractor
P-12-200-3034NA Klamath Project - Oregon-California. View of borrow area before borrowing operations were begun. The borrow area was used as rock backfill. Bill Long, foreman, is in background; July ...Citation -
235. [Image] Clear Lake Spillway Rehabilitation - Specs. 200C-889 - Roy D. Garren Corporation, Contractor
P-12-200-3039NA Klamath Project - Oregon-California. View of equipment used to place concrete in right protective slab under bridge; July 1974; USBR photo by D. W. SteinCitation -
236. [Image] Closed Drain Construction, Tule Lake Area, Sump 3 - Specs. 200C-910 - Patterson Construction Company, Contractor
P-12-200-3063NA Klamath Project - Oregon-California. View of cinder borrow pit area. Homemade shaker with 3" screen, screening out oversized material from material to be used as envelope around closed ...Citation -
237. [Image] Closed Drain Construction, Tule Lake Area, Sump 3 - Specs. 200C-910 - Patterson Constr. Company, Contractor
P-12-200-3083NA Klamath Project - Oregon-California. View of small screening plant and loader, at Turkey Hill borrow pit, screening out the 3" oversize from the cinder material to be used as envelope ...Citation -
P12-201-4285 NA Klamath Project OR-CA. Water jet pump and power supply mounted on flat bed. Used for water jetting 2 piles, Center Canal flume pier; January 4, 1977; USBR photo by D. J. Kline
Citation -
P12-201-4290 NA Klamath Project OR-CA. 3/4-yard bucket used with Manitowoc 3500 dragline to lift concrete from transit mixer to pier (excavation site). Center Canal flume in background; January 14, 1977; ...
Citation -
P-12-201-4303 NA Klamath Project, OR-CA. Soldier piling (1'x1') driven to contractor's plan to a depth of ±9', to be used in conjunction with wood lagging to protect worker and work inside Plant EE work ...
Citation