Search
You searched for:
Start Over
Dams
Remove constraint Dams
Author
United States. Bureau of Reclamation
Remove constraint Author: United States. Bureau of Reclamation
Subject
Trucks
Remove constraint Subject: Trucks
1 - 10 of 10
Search Results
-
KP-1305-R2 Klamath Project. Boundary Dam Materials Investigations. Region II. Carr Butte area trench pit #2 near top of the Butte coarse, red volcanic cinders; February 6, 1947; Photo by Dorwin Gri...
Citation -
P-12-200-2996NA Klamath Project - Oregon-California. View of bobtailed truck and trailer, unloading sand and aggregate for concrete at Clear Lake Dam. This was an owner-operated truck; May 1974; Bureau ...
Citation -
P-12-200-2997NA Klamath Project - Oregon-California. View of bobtailed truck and trailer, unloading sand and aggregate for concrete at Clear Lake Dam. (This was an owner-operated truck); May 1974; Bureau ...
Citation -
P-12-200-2998NA Klamath Project - Oregon-California. View of bobtailed truck and trailer unloading sand and aggregate for concrete at Clear Lake Dam. (Owner operator's); May 1974; Bureau of Reclamation ...
Citation -
P-12-200-2952NA Klamath Project - Oregon-California. View shows dumping concrete from a 7 cubic yard White mixer truck into a 1 cubic yard bucket. Mr. Don Thompson, sub-contractor, is standing beside ...
Citation -
P-12-200-2960NA Klamath Project - Oregon-California. Contractor's dry batch plant. View showing 7 cubic yard Rex mixer truck being loaded with sand and aggregate; April 1974; Bureau of Reclamation photo ...
Citation -
P-12-200-2961NA Klamath Project - Oregon-California. View of dry batch plant. Three cubic yard front end loader in the process of filling the hopper with sand and aggregate. Note the scale dial on left ...
Citation -
P-12-200-3004NA Klamath Project - Oregon-California. Photo showing sub-contractor placing concrete along spillway crest section between Sta. 1+00 and Sta. 1+30. Concrete was mixed in mixer truck and placed ...
Citation -
9. [Image] Clear Lake Spillway Rehabilitation - Specs. 200C-889 - Roy D. Garren Corporation, Contractor
P-12-200-3047NA Klamath Project - Oregon-California. View of 977-K Loader filling 10 cubic yard Ford end-dump truck with backfill material. The backfill material will be placed behind the end walls; ...Citation -
10. [Image] Clear Lake Spillway Rehabilitation - Specs. 200C-889 - Roy D. Garren Corporation, Contractor
P-12-200-3050NA Klamath Project - Oregon-California. View of right wall. 10 cubic yard end dump truck unloading load of backfill material; June 1974; USBR photo by D. W. SteinCitation