Search

You searched for: Start Over Photos Remove constraint Photos Author United States. Bureau of Reclamation Remove constraint Author: United States. Bureau of Reclamation Subject N-Canal (California) Remove constraint Subject: N-Canal (California) Subject Tule Lake Region (California) Remove constraint Subject: Tule Lake Region (California) Material Types Image Remove constraint Material Types: Image

Search Results

  • 3412
    P12-200-2707 - Klamath Project - TULE LAKE SUMP 3 - Specs. No. DC-5389 - N-1 Lateral. View of berm and drain adjacent to cracked section of lateral. Note no significant evidence of movement or uplift ...
    Citation
  • 3413
    P12-200-2708 - Klamath Project - TULE LAKE SUMP 3 - Contract Unit 1 - Specs. DC-5389 - N-1 Lateral. North face of trench at Station 102+70; February 7, 1963; Photo by C. D. Lawrence
    Citation
  • 3414
    P12-200-2709 - Klamath Project - TULE LAKE SUMP 3 - Contract Unit 1 - Specs. DC-5389 - N-1 Lateral. South face of trench at Station 105+00; February 7, 1963; Photo by C. D. Lawrence
    Citation
  • 3415
    P12-200-2710 - Klamath Project - TULE LAKE SUMP 3 - Contract Unit 1 - Specs. DC-5389 - N-1 Lateral. View of water standing on lining directly over crack four days after storm of February 1-3, 1963. Note ...
    Citation
  • 3760
    P12-200-2662 - Klamath Project, California - TULE LAKE SUMP 3, Specs. DC-5621. N-12-b Lateral, Sta. 54. 1 1/2 cu yard Link Belt Dragline building normal bank on top of lining. Material will be smoothed ...
    Citation
  • 2612
    KP-1975- Klamath Project. Tule Lake Sump Dikes. Looking south from County Road Bridge. Picture shows N-Canal and area west of canal bank including 101-A-2-a Drain and Borrow Strip; June 15, 1950; Photo ...
    Citation
  • 2620
    KP-1983-R2 - Klamath Project. Tule Lake Sump Dikes. Looking south. Picture shows N-Canal, Great Northern Railroad and borrow area on both sides of railroad; June 29, 1950; Photo by Andrew M. Bergloff...
    Citation
  • 3645
    KP-2579-R2-Klamath Project - TULE LAKE DIVISION, SUMP 3, Specifications DC-5389, N-1 Lateral. Hancock elevating scraper placing select lining material at Station 84+00; January 26, 1961; Photo by Sam C. ...
    Citation
  • 3646
    KP-2580-R2-Klamath Project - TULE LAKE DIVISION, SUMP 3, Specifications DC-5389, N-1 Lateral. 48" LaTourneau roller compacting selected earth lining near Station 82+00; January 26, 1961; Photo by Sam ...
    Citation
  • 3659
    KP-2587-R2-Klamath Project - TULE LAKE DIVISION, SUMP 3, Specifications DC-5389, N-1 Lateral. View showing workmen compacting backfill about 24-inch metal turnout at Sta.40+65; March 24, 1961; Photo by ...
    Citation