Search
You searched for:
Start Over
Land use history
Remove constraint Land use history
Author
United States. Bureau of Reclamation
Remove constraint Author: United States. Bureau of Reclamation
Subject
Klamath Straits Drain (Oregon)
Remove constraint Subject: Klamath Straits Drain (Oregon)
Subject
Pumping stations -- Design and construction
Remove constraint Subject: Pumping stations -- Design and construction
Material Types
Image
Remove constraint Material Types: Image
« Previous | 1 - 10 of 21 | Next »
Search Results
-
P-12-201-4302 NA Klamath Project, OR-CA. Crane moving to second landing to complete second half of Plant EE excavation. View Looking east; December 1976; USBR photo by D. J. Kline
Citation -
P-12-201-4295 NA Klamath Project, OR-CA. Excavation of Pumping Plant EE site, using dragline. A 3500 Manitowoc crane with 1-yard bucket, was in use. Material encountered was same as indicated in Drawing ...
Citation -
P12-201-4386 NA Klamath Project, OR-CA. Laborers working on compacted backfill on east side of Pumping Plant EE. Wackers were used on 6" lifts along sides close to structure. Five ton vibratory roller ...
Citation -
P12-201-4479 NA Klamath Project, OR-CA. Contractor had to pre-excavate sites where PP 'E' bridge piling would be driven. During construction of PP 'E', a pit run material was used for backfill. Apparently ...
Citation -
P12-201-4488 NA Klamath Project, OR-CA. Picture taken of RHC 1/4" steel plate to be used as a bulkhead in CMP "84" hydrostatic test. This one to be inserted in round CMP to concrete transition west of ...
Citation -
P12-201-4510 NA Klamath Project, OR-CA. Pumping Plant FF -- Photo shows north wall of siphon inlet transition after compacted backfill operations were approximately 50% completed. Note plastic covering ...
Citation -
P12-201-4534 NA Klamath Project, OR-CA. Pumping Plant EE -- Plant E bridge piling at a depth of 39 feet after nearly 2 days' work. Note water jet at this time consisted of 3/4" steel pipe with Gorman Rupp ...
Citation -
P12-201-4574NA Klamath Project, OR-CA. Pumping Plant EE. Drain excavation outlet side using Bycyrus (sic) Erie 22B dragline with 1 yd. bucket. Note stilling well and flow pipes to stilling well; April ...
Citation -
P-12-201-4303 NA Klamath Project, OR-CA. Soldier piling (1'x1') driven to contractor's plan to a depth of ±9', to be used in conjunction with wood lagging to protect worker and work inside Plant EE work ...
Citation -
P12-201-4318 NA Klamath Project, OR-CA. Vulcan No. 1 hammer to be used in Pumping Plant EE pile driving; January 18, 1977; USBR photo by D. J. Kline
Citation