You searched for: Start Over History Remove constraint History Author United States. Bureau of Reclamation Remove constraint Author: United States. Bureau of Reclamation Subject Klamath Straits Drain (Oregon) Remove constraint Subject: Klamath Straits Drain (Oregon) Subject Pumping stations -- Design and construction Remove constraint Subject: Pumping stations -- Design and construction Material Types Image Remove constraint Material Types: Image Database Klamath Waters Library Remove constraint Database: Klamath Waters Library

Search Results

  • 4311
    P-12-200-4229NA Klamath Project - Oregon-California. Excavating site for pumping plant "EE". One TD-25 dozer and one D-8 dozer excavating area down to elev. 4070. View lookig north. This is the first ...
    Citation
  • 4312
    P-12-200-4230NA Klamath Project - Oregon-California. View of downstream transition area of Pumping Plant "EE" (right side). Excavation line can be seen at rt. side of photo; September 1976; USBR photo ...
    Citation
  • 4313
    P-12-200-4231NA Klamath Project - Oregon-California. Pumping Plant "E" area, rt. side of downstream transition. View of showing seepage at elev. 4070± at toe of contractors excavation; September 1976; ...
    Citation
  • 4314
    P-12-200-4232NA Klamath Project - Oregon-California. Pumping Plant "EE" site. View of material before drilling operations for dewatering well. Note large boulders that were excavated. This material ...
    Citation
  • 4315
    P-12-200-4234NA Klamath Project - Oregon-California. This dewatering well was excavated approximately 10 feet deep with back hoe due to rock that was placed at plant when constructed this was excavated ...
    Citation
  • 4316
    P-12-200-4233NA Klamath Project - Oregon-California. Rotary drill rig drilling wells for dewatering Pumping Plant "EE" site. Site was excavated to elev. 4070± and 24" wells were drilled 30± feet; 10" ...
    Citation
  • 4559
    P12-201-4477 NA Klamath Project, OR-CA. Spoils removed from west side of PP 'E' bridge pile location sites. Note large rock; November 16, 1977; USBR photo by D.J. Kline
    Citation
  • 4560
    P12-201-4478 NA Klamath Project, OR-CA. View of a typical hole excavated by contractor to a depth of 12'. At this point material thinned out. Also this was maximum depth attainable by Case 580C Extend-a-Hoe; ...
    Citation
  • 4561
    P12-201-4479 NA Klamath Project, OR-CA. Contractor had to pre-excavate sites where PP 'E' bridge piling would be driven. During construction of PP 'E', a pit run material was used for backfill. Apparently ...
    Citation
  • 4562
    P12-201-4480 NA Klamath Project, OR-CA. Photo shows damaged area of PP 'E' outlet transition west wall. Photo taken prior to pile driving operations. Looking down; November 15, 1977; USBR photo by D.J. ...
    Citation