Search
You searched for:
Start Over
Land use history
Remove constraint Land use history
Author
United States. Bureau of Reclamation
Remove constraint Author: United States. Bureau of Reclamation
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
« Previous | 91 - 100 of 210 | Next »
Search Results
-
KP-2117-R2. Jack Wynant, ditchrider, receiving incentive award check from R. S. Hopkins, Irrigation Manager, Klamath Project, for the use of water on saw in cutting rolled asphalt material; April 9, 1952; ...
Citation -
92. [Image] EXTENSION DEDICATION AT STUKEL PUMPING PLANT
P12-200-2738 - Klamath Project - EXTENSION DEDICATION AT STUKEL PUMPING PLANT. Part of crowd of local people at afternoon dedication--several hundred attended evening banquet at Country Club; August 9, ...Citation -
93. [Image] N-12-a Lateral and 101-A-1 Drain
KP-1098-R2 - Klamath Project - Tule Lake Division - Modoc Unit; Excavation on the construction of the lateral is proceeding by use of an Osgood dragline. The west bank seen in the left of the picture ...Citation -
94. [Image] TULE LAKE SUMP 3 - 101-C Drain
P12-200-2681 - Klamath Project, California - TULE LAKE SUMP 3 - 101-C Drain. View of equipment putting aqualine herbicide in drain to kill moss. Forty parts per million were used and was effective; July ...Citation -
C12-200-2706 - Klamath Project - TULE LAKE SUMP 3 - Specs. No. DC-5389 - N-1 Lateral. Recently-discovered crack in bottom of N-1 Lateral. View looking upstream near Sta. 102. Lateral was in use during ...
Citation -
96. [Image] CLEAR LAKE - Underwater soil sampling procedure
KP-2404-R2 - CLEAR LAKE - Klamath Project. Pumping air into bottom section of vehmeir tube to extrude soil sample. Winch at right is used to lower and raise 3" pipe in center of raft. Small winch at corner ...Citation -
97. [Image] TULE LAKE SUMP - Sump sounding
KP-2416-R2 - TULE LAKE SUMP - Klamath Project. Sump was sounded to determine elevation of bottom for planning studies. Airboat rented from Fish and Wildlife Service, was used due to shallow depth. Burt ...Citation -
98. [Image] TULE LAKE SUMP - Sump sounding job
KP-2417-R2 - TULE LAKE SUMP - Klamath Project. Lynn Skeen at triangulation station operating plane table on which sounding courses have been plotted. When air boat stopped to make sounding a flag was waved ...Citation -
KP-1507-R2 - Klamath Project; Using 2" X 4" strike-off, the improvement in the surface, caused by the second pass of the 4" X 6" strike-off, is readily noted above the 2" X 4" strike-off; July 18, 1947; ...
Citation -
100. [Image] "M" Canal Lining, Station 131, looking Northeast - Placing concrete lining with completed panels on each side
KP-1508-R2 - Klamath Project; Using wood bull float after striking off with 2 x 4; Time approximately 1:40 P. M., July 18, 1947; Stacy, contractor; Photo by H. W. SextonCitation