You searched for: Start Over Land use history Remove constraint Land use history Author United States. Bureau of Reclamation Remove constraint Author: United States. Bureau of Reclamation Subject Irrigation projects Remove constraint Subject: Irrigation projects Subject Piling (Civil engineering) Remove constraint Subject: Piling (Civil engineering) Subject Pumping stations -- Design and construction Remove constraint Subject: Pumping stations -- Design and construction

Search Results

  • 4561
    P12-201-4479 NA Klamath Project, OR-CA. Contractor had to pre-excavate sites where PP 'E' bridge piling would be driven. During construction of PP 'E', a pit run material was used for backfill. Apparently ...
    Citation
  • 4400
    P12-201-4318 NA Klamath Project, OR-CA. Vulcan No. 1 hammer to be used in Pumping Plant EE pile driving; January 18, 1977; USBR photo by D. J. Kline
    Citation
  • 4444
    P12-201-4362 NA Klamath Project, OR-CA. Plant FF - Driving 1:2 batter piles at plant FF site. Manitowoc 2900 crane with 90 ft. leads using 50-C hammer, driven by Clayton Steam Generator. View looking ...
    Citation
  • 4445
    P12-201-4363 NA Klamath Project, OR-CA. Plant FF--Manitowoc 1900 Crane with 95 ft. boom and 90 ft. of leads driving batter pile at Plant FF site. Clayton Steam Generator mounted on rear of crane used ...