Search

You searched for: Start Over History Remove constraint History Author United States. Bureau of Reclamation Remove constraint Author: United States. Bureau of Reclamation Subject Irrigation projects Remove constraint Subject: Irrigation projects Subject Klamath Project (U.S.) -- History Remove constraint Subject: Klamath Project (U.S.) -- History Subject Q-Canal (California) Remove constraint Subject: Q-Canal (California) Subject Tule Lake Sump (California) Remove constraint Subject: Tule Lake Sump (California)

Search Results

  • 3425
    P12-200-2720 - Klamath Project - Tule Lake Sump 2 - Q-1 Lateral, Station 13. View of left bank and farm turnout constructed two years ago. Note extent of exposure of cut stake hubs which at the time of ...
    Citation
  • 3802
    P12-200-2795A Tule Lake Sumps - Klamath Project--Oregon California. View of opening cut in Q-Canal Bank just below headworks discharging controlled release of flood water from Sump 1-A to Sump 2. Water ...
    Citation
  • 3580
    KP-2564-R2-Klamath Project - TULE LAKE DIVISION, Sump 2, Specifications DC-5248, Q-Canal. Completed section of Q-Canal, looking downstream from Station 5+00. Bottom width 10 feet, height of canal banks, ...
    Citation
  • 3581
    KP-2565-R2-Klamath Project - TULE LAKE DIVISION, Sump 2, Specifications DC-5248, Q-Canal. Completed section of Q-Canal, looking upstream from Station 48+00. Bottom width, 10 feet; height of canal banks, ...
    Citation
  • 3582
    KP-2566-R2-Klamath Project - TULE LAKE DIVISION, Sump 2, Q-Canal - Specifications DC-5248. Prefabricated metal farm turnout inlet with well for flow measurement; September 21, 1960; Photo by John A. Re...
    Citation
  • 3583
    KP-2567-R2-Klamath Project - TULE LAKE DIVISION, Sump 2, Specifications DC-5248, Q-Canal. Installing prefabricated metal farm turnout at Station 9+50, Q-Canal metal diaphragm in background; October 18, ...
    Citation
  • 3584
    KP-2568-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, Q-1 Lateral. Installing prefabricated metal wasteway at the end of the Q-1 Lateral, Station 88+33.7. Backfill compacted ...
    Citation
  • 3585
    KP-2569-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, Q-2 Lateral. Water truck sprinkling material placed by Hancock Elevating Scraper for lining of Q-2 Lateral, Station 22+00 ...
    Citation
  • 3586
    KP-2570-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, Q-2 Lateral. Hancock Elevating Scraper Model 7E2 and John Deere Tractor, Model 840 placing lining material on Q-2 Lateral ...
    Citation
  • 3647
    KP-2581-R2-Klamath Project - TULE LAKE DIVISION, SUMP 2, Specifications DC-5248, Q-Canal. Q-Canal headworks showing gate lifts installed and inlet channel completed; January 17, 1961; Photo by John A. ...
    Citation