Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Author
United States. Bureau of Reclamation
Remove constraint Author: United States. Bureau of Reclamation
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
Subject
Q-Canal (California)
Remove constraint Subject: Q-Canal (California)
Subject
Tule Lake Region (California)
Remove constraint Subject: Tule Lake Region (California)
« Previous | 1 - 10 of 21 | Next »
Search Results
-
KP-2569-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, Q-2 Lateral. Water truck sprinkling material placed by Hancock Elevating Scraper for lining of Q-2 Lateral, Station 22+00 ...
Citation -
KP-2570-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, Q-2 Lateral. Hancock Elevating Scraper Model 7E2 and John Deere Tractor, Model 840 placing lining material on Q-2 Lateral ...
Citation -
P12-200-2714 - Klamath Project - TULE LAKE SUMP 2 - View east across Q canal showing dust storm; March 28, 1963; Photo by C. D. Lawrence
Citation -
4. [Image] Tule Lake Sump 2 - Q-1 Lateral, Station 13
P12-200-2720 - Klamath Project - Tule Lake Sump 2 - Q-1 Lateral, Station 13. View of left bank and farm turnout constructed two years ago. Note extent of exposure of cut stake hubs which at the time of ...Citation -
P12-200-2795A Tule Lake Sumps - Klamath Project--Oregon California. View of opening cut in Q-Canal Bank just below headworks discharging controlled release of flood water from Sump 1-A to Sump 2. Water ...
Citation -
KP-2554-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248 - Q-Canal. TD-18 Tractor and 4'x4' dual drum sheepsfoot roller compacting canal lining, bottom of Q-Canal, Station 38+00; ...
Citation -
KP-2555-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, Q-1 Lateral. 10 cubic yard scraper and TD-14 tractor placing lining in left bank lateral, Station 1+00; July 29, 1960; ...
Citation -
KP-2564-R2-Klamath Project - TULE LAKE DIVISION, Sump 2, Specifications DC-5248, Q-Canal. Completed section of Q-Canal, looking downstream from Station 5+00. Bottom width 10 feet, height of canal banks, ...
Citation -
KP-2565-R2-Klamath Project - TULE LAKE DIVISION, Sump 2, Specifications DC-5248, Q-Canal. Completed section of Q-Canal, looking upstream from Station 48+00. Bottom width, 10 feet; height of canal banks, ...
Citation -
KP-2566-R2-Klamath Project - TULE LAKE DIVISION, Sump 2, Q-Canal - Specifications DC-5248. Prefabricated metal farm turnout inlet with well for flow measurement; September 21, 1960; Photo by John A. Re...
Citation