Search
You searched for:
Start Over
Land use history
Remove constraint Land use history
Author
United States. Bureau of Reclamation
Remove constraint Author: United States. Bureau of Reclamation
Subject
Irrigation canals and flumes -- Design and construction
Remove constraint Subject: Irrigation canals and flumes -- Design and construction
Subject
Klamath Straits Drain (Oregon)
Remove constraint Subject: Klamath Straits Drain (Oregon)
Material Types
Image
Remove constraint Material Types: Image
« Previous | 1 - 10 of 19 | Next »
Search Results
-
P12-201-4565NA Klamath Project, OR-CA. Center Canal Flume Bridge. After the 3/4" hole was augered, a steel pin was used to punch a mark on the opposite side of the steel sleeve. Then an oxy-acetylene ...
Citation -
P-12-200-4149NA Klamath Project - Oregon-California. Widening and Deepening of Center Govt. Drain by USBR, Using FWS Bucyrus-Erie Dragline w/½ cu. yd. Bucket, Klamath Straits Unit-East. Dike Created ...
Citation -
P-12-200-4150NA Klamath Project - Oregon-California. Widening and Deepening of Center Govt. Drain by USBR, Using FWS Bucyrus-Erie Dragline w/½ cu. yd. Bucket, Klamath Straits Unit-East. View of drain, ...
Citation -
P-12-200-4151NA Klamath Project - Oregon-California. Widening and Deepening of Center Govt. Drain by USBR, Using FWS Bucyrus-Erie Dragline w/½ cu. yd. Bucket, Klamath Straits Unit-East. Dragline dumping ...
Citation -
P12-201-4492 NA Klamath Project, OR-CA. Template being used over screeding in placing bedding material for 84" RCP; December 2, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4515 NA Klamath Project, OR-CA. Ady Canal -- View of outlet transition slab prior to placement. Note heater and tank which will be used to keep temperature above 50° F; February 20, 1978; USBR ...
Citation -
P12-201-4559NA Klamath Project, OR-CA. Center Canal Flume Bridge. Note 3' long x 1' wide x 1/4 " steel (Schedule 20) sleeves to be used by RHC to splice piles that did not reach minimum penetration; ...
Citation -
P12-201-4562NA Klamath Project, OR-CA. Center Canal Flume Bridge. The steel sleeve was placed on the pile and the holes in the sleeve were marked on the pile. The sleeve was then removed and a ship's ...
Citation -
P12-201-4564NA Klamath Project, OR-CA. Center Canal Flume Bridge. The top or splice piling is inserted into the sleeve and then the ship's auger was used to bore out the hole for the 3/4 " bolt; April ...
Citation -
P12-201-4568NA Klamath Project, OR-CA. Ady Canal -- Siphon hydrostatic test -- Plant FF. Water in CMP was held at head of 10" using 192 GMP Homelite pump regulated by means of valve on downstream side ...
Citation