Search
You searched for:
Start Over
Land use history
Remove constraint Land use history
Author
United States. Bureau of Reclamation
Remove constraint Author: United States. Bureau of Reclamation
Subject
Irrigation canals and flumes -- Design and construction
Remove constraint Subject: Irrigation canals and flumes -- Design and construction
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
Subject
Klamath Straits Drain (Oregon)
Remove constraint Subject: Klamath Straits Drain (Oregon)
« Previous | 11 - 19 of 19 | Next »
Search Results
-
P12-201-4569NA Klamath Project, OR-CA. Ady Canal -- Siphon hydrostatic test -- Plant FF. Shown is standpipe with fill hose attached. Note plastic tube with colored water used for water level indicator. ...
Citation -
P12-201-4391 NA Klamath Project, OR-CA. View of piling on north side of flume. Also note temporary pier built on piling originally used by contractor for false work in construction of flume; June 16, 1977; ...
Citation -
P12-201-4422 NA Klamath Project, OR-CA. Ady Canal--1'x1' steel H beam was used between kickers and tunnel cribbing; August 25, 1977; USBR photo by D.J. Kline
Citation -
P12-201-4426 NA Klamath Project, OR-CA. Ady Canal--To get carrier pipe through the tunnel liner ice (crushed) was spread over sand bedding in tunnel liner plate. A car hood was used as a sled on leading ...
Citation -
P12-201-4432 NA Klamath Project, OR-CA. Ady Canal--the cribbing was cut with a chainsaw and tunnel shield pushed through the hole using hydraulics. View looking west as the shield exits through the shoring; ...
Citation -
P12-201-4455 NA Klamath Project, OR-CA. Ady Canal--View of siphon pipe laying operation looking from hwy. west toward RR. Pettibone 30 Multicrane used for lifting; September 1977; USBR photo by D.J. ...
Citation -
P12-201-4464 NA Klamath Project, OR-CA. Center Canal Flume--Old timber piling used for flume support in original construction. 12' long max. Note: Tip of piling was pre-sharpened; October 1977; USBR ...
Citation -
P12-201-4465 NA Klamath Project, OR-CA. Ady Canal, U.S. Hwy 97 & SP RR siphon--view looking west upstream end of 84" CAP at Hwy 97. View shows bulkhead that was constructed by contractor for use in ...
Citation -
P12-201-4471 NA Klamath Project, OR-CA. Ady Canal -- Concrete is being placed in slab of inlet into syphon. Concrete is wet batched from CPI plant from Klamath Falls, OR. It is hauled out to job site in ...
Citation