Search
You searched for:
Start Over
Land use history
Remove constraint Land use history
Author
United States. Bureau of Reclamation
Remove constraint Author: United States. Bureau of Reclamation
Subject
Irrigation canals and flumes -- Design and construction
Remove constraint Subject: Irrigation canals and flumes -- Design and construction
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
« Previous | 1 - 10 of 29 | Next »
Search Results
-
P12-200-2791A Klamath River - Klamath Project--Oregon. Employees of M-K Co., under contract with PP&L Co., drilling rock and placing explosive for excavation of 100' X 12' X 3500' channel through Keno ...
Citation -
2. [Image] Pumping Plant "S"
KP-2141-R2 - Klamath Project. Pumping Plant "S". Bottom of excavation for corrugated metal pipe wells and foundation slab. Piling and rock base being used for foundation due to extremely soft wet foundation ...Citation -
P12-201-4565NA Klamath Project, OR-CA. Center Canal Flume Bridge. After the 3/4" hole was augered, a steel pin was used to punch a mark on the opposite side of the steel sleeve. Then an oxy-acetylene ...
Citation -
KP-1507-R2 - Klamath Project; Using 2" X 4" strike-off, the improvement in the surface, caused by the second pass of the 4" X 6" strike-off, is readily noted above the 2" X 4" strike-off; July 18, 1947; ...
Citation -
KP-1508-R2 - Klamath Project; Using wood bull float after striking off with 2 x 4; Time approximately 1:40 P. M., July 18, 1947; Stacy, contractor; Photo by H. W. Sexton
Citation -
KP-1509-R2 - Klamath Project; Using Fresno float (steel) after bull float; Time approximately 1:44 P. M., July 18, 1947; Stacy, contractor; Photo by H. W. Sexton
Citation -
KP-1511-R2 - Klamath Project. Steel in place, completed panels shown, screeds in place, steel men working. Paper is used to prevent curing compound getting on steel. Man with hose, who wets down subgrade ...
Citation -
P12-200-2793A Klamath River - Klamath Project--Oregon. View from existing Keno regulating dam showing M-K Co. dragline removing blasted rock from by-pass channel. Equipment at right is on old spoil pile, ...
Citation -
KP-2573-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5307, R-Canal. 4-inch diameter aluminum pipe sprinkler system being used to sprinkle borrow areas adjacent to R-Canal, Station ...
Citation -
P-12-200-4132NA Klamath Project - Oregon-California. View of Cat 966-B front end loader used to excavate topsoil. Pile, right center, was placed by loader; December 1975; USBR photo by R. J. Hamilto...
Citation