P12-201-4310 NA Klamath Project, OR-CA. Below broken ice is inlet to 48" CMP which was flooded by earthen dam breaking, causing slide gate on inlet to Center Canal flume to backseat and leak; January ...
Citation -
P12-201-4311 NA Klamath Project, OR-CA. Center Canal - backflooding against 48" slide gate, causing gate to unseat and allowed flooding of flume inlet transition; January 17, 1977; USBR photo by D. J. ...
Citation -
P12-201-4312 NA Klamath Project, OR-CA. Center Canal - existing flume outlet, where flooding exited after flowing down entire length of existing flume and flowing into flume pier excavation; January 17, ...
Citation -
P12-201-4313 NA Klamath Project, OR-CA. Center Canal - Contractor built an earth diversion dam at inlet to 48" CMP turnout located adjacent to flume inlet transition; January 17, 1977; USBR photo by ...
Citation -
P12-201-4314 NA Klamath Project, OR-CA. Center Canal - Contractor placed electric pump to remove flood water from flume inlet transition; January 17, 1977; USBR photo by D. J. Kline
Citation -
KP-1682 - Klamath Project - Seepage Studies. Note that the seepage cracks are located in the undisturbed natural ground beneath the lateral embankment. Parallel drain is constructed to intercept seepage ...
Citation