Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Author
United States. Bureau of Reclamation
Remove constraint Author: United States. Bureau of Reclamation
Subject
Draglines
Remove constraint Subject: Draglines
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
« Previous | 81 - 90 of 104 | Next »
Search Results
-
P12-200-2842NA Removal of Flood Debris from open drain ditches in the Tulelake Area - Sump 2 - Klamath Project - Oregon - California. Excavating silt and straw from the 102-Drain adjacent to unit No. ...
Citation -
82. [Image] Bank Failure - Klamath Straits Drain
P12-200-2890A Klamath Project - Oregon-California. View of draglines excavating silt and sand in drain, looking north; August 1970; Bureau of Reclamation photo by D. W. SteinCitation -
KP-2556-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, 102-E Drain. Model 80 Lorain Dragline with 2 cubic yard bucket excavating the 102-E Drain, Station 94+00; August 23, 1960; ...
Citation -
KP-2623-R2-Klamath Project -- TULE LAKE SUMP 2, Specifications No. DC-5483, 102-H Drain. Model 90 Link Belt speeder dragline with 1 1/2 cubic-yard bucket excavating drain prism at Sta. 35+50; September ...
Citation -
KP-2636-R2-Klamath Project -- TULE LAKE SUMP 3, Pumping Plant 11, Specifications 200C-483. 22-B dragline with 2000 lb. hammer driving round treated timber piling at Pumping Plant 11; November 8, 1961; ...
Citation -
P12-200-2640-Klamath Project, California - TULE LAKE SUMP 3, Pumping Plant 11, Specifications 200C-483. 15-B dragline with 2000 lb hammer driving timber piling to support spillway inlet. Spillway connects ...
Citation -
P12-201-4527 NA Klamath Project, OR-CA. Photo shows Manitowoc dragline with 80 ft. boom and 2 1/4 cu.yd. bucket excavating drain upstream of plant FF inlet. Inlet transition can be seen, looking east. ...
Citation -
P12-201-4570NA Klamath Project, OR-CA. Pumping Plant EE. Bucyrus Erie 22-B dragline excavating drain inlet to Plant EE. Note inlet was flooded prior to connecting drain to pumping plant; April 11, ...
Citation -
P12-201-4571NA Klamath Project, OR-CA. Plant EE. Muck from inlet excavation was double and triple hauled from inlet to just south of flume bridge, then over flume to spoils pile south of flume. It was ...
Citation -
P12-201-4574NA Klamath Project, OR-CA. Pumping Plant EE. Drain excavation outlet side using Bycyrus (sic) Erie 22B dragline with 1 yd. bucket. Note stilling well and flow pipes to stilling well; April ...
Citation