Search

You searched for: Start Over Land use history Remove constraint Land use history Author United States. Bureau of Reclamation Remove constraint Author: United States. Bureau of Reclamation Subject Draglines Remove constraint Subject: Draglines Subject Irrigation projects Remove constraint Subject: Irrigation projects Material Types Image Remove constraint Material Types: Image

Search Results

  • 1538
    KP-1194-R2 - Klamath Project. Region II. Another yard and a half of soil in Tulelake is dumped from a Bucyrus Erie dragline that is being used to construct a new drain to take care of the expanding agricultural ...
    Citation
  • 1537
    KP-1193-R2 - Klamath Project. Region II. Although Klamath Project has been operating for a long time, construction still goes on as the project is constantly enlarged and improved to take care of the ...
    Citation
  • 4376
    P-12-201-4295 NA Klamath Project, OR-CA. Excavation of Pumping Plant EE site, using dragline. A 3500 Manitowoc crane with 1-yard bucket, was in use. Material encountered was same as indicated in Drawing ...
    Citation
  • 1440
    KP-1098-R2 - Klamath Project - Tule Lake Division - Modoc Unit; Excavation on the construction of the lateral is proceeding by use of an Osgood dragline. The west bank seen in the left of the picture ...
    Citation
  • 3800
    P12-200-2793A Klamath River - Klamath Project--Oregon. View from existing Keno regulating dam showing M-K Co. dragline removing blasted rock from by-pass channel. Equipment at right is on old spoil pile, ...
    Citation
  • 4233
    P-12-200-4151NA Klamath Project - Oregon-California. Widening and Deepening of Center Govt. Drain by USBR, Using FWS Bucyrus-Erie Dragline w/½ cu. yd. Bucket, Klamath Straits Unit-East. Dragline dumping ...
    Citation
  • 4234
    P-12-200-4152NA Klamath Project - Oregon-California. Widening and Deepening of Center Govt. Drain by USBR, Using FWS Bucyrus-Erie Dragline w/½ cu. yd. Bucket, Klamath Straits Unit-East. View of ½ cu. ...
    Citation
  • 4656
    P12-201-4574NA Klamath Project, OR-CA. Pumping Plant EE. Drain excavation outlet side using Bycyrus (sic) Erie 22B dragline with 1 yd. bucket. Note stilling well and flow pipes to stilling well; April ...
    Citation
  • 5128
    CN-12-201-588NA Klamath Project - Oregon-California. View of Bucyrus-Erie 22-B dragline used to move drilling platform from place to place on downstream face of dam. Dragline was borrowed from Fish and ...
    Citation
  • 5132
    CN-12-201-592NA Klamath Project - Oregon-California. View of Bucyrus-Erie 22=B dragline used to lift drilling platform; October 1969; USBR photo by C. D. Lawrence
    Citation