Search
You searched for:
Start Over
Irrigation
Remove constraint Irrigation
Author
United States. Bureau of Reclamation
Remove constraint Author: United States. Bureau of Reclamation
Subject
Draglines
Remove constraint Subject: Draglines
Subject
Drainage
Remove constraint Subject: Drainage
Subject
Irrigation projects
Remove constraint Subject: Irrigation projects
Subject
Klamath Project (U.S.) -- History
Remove constraint Subject: Klamath Project (U.S.) -- History
Subject
Tule Lake Region (California)
Remove constraint Subject: Tule Lake Region (California)
« Previous | 1 - 10 of 12 | Next »
Search Results
-
KP-2512-R2-Klamath Project -- SUMP 2 - TULE LAKE. Excavation and cleaning of 102 Drain by 65-ton Fish and Wildlife Dragline at about Station 60+00. Work is being performed under agreement with U.S.B.R.; ...
Citation -
KP-2513-R2 -- Klamath Project -- SUMP 2 - TULE LAKE. Trench was excavated to hold muck; July 30, 1959; Photo by L. McAnulty
Citation -
3. [Image] TULE LAKE DIVISION - Sump 2
KP-2387-R2 - Klamath Project--TULE LAKE DIVISION. Experimental drain, looking north showing material which has been pushed up in bottom of drain; May 14, 1957; Photo by K. J. GreeneCitation -
4. [Image] TULE LAKE DIVISION - Sump 2
KP-2386-R2 - Klamath Project--TULE LAKE DIVISION. Experimental drain about 300' south of pumping plant, looking N.W. to dragline which has been excavating material pushed up in bottom of drain. Bank has ...Citation -
KP-1193-R2 - Klamath Project. Region II. Although Klamath Project has been operating for a long time, construction still goes on as the project is constantly enlarged and improved to take care of the ...
Citation -
KP-1194-R2 - Klamath Project. Region II. Another yard and a half of soil in Tulelake is dumped from a Bucyrus Erie dragline that is being used to construct a new drain to take care of the expanding agricultural ...
Citation -
P12-200-2839NA Removal of Flood Debris from Tulelake Drains - Sump 2 Area - Klamath Project - Oregon - California. 102-C-1 Drain looking south, taken from intersection of 102-D Drain. 22-B dragline with ...
Citation -
P12-200-2841NA Removal of Flood Debris from open drain ditches in the Tulelake Area - Sump 2 - Klamath Project - Oregon - California. Contractor - Francis D. Brown and Son, Inc. 22-B dragline excavating ...
Citation -
P12-200-2842NA Removal of Flood Debris from open drain ditches in the Tulelake Area - Sump 2 - Klamath Project - Oregon - California. Excavating silt and straw from the 102-Drain adjacent to unit No. ...
Citation -
KP-2556-R2-Klamath Project - TULE LAKE DIVISION - Sump 2, Specifications DC-5248, 102-E Drain. Model 80 Lorain Dragline with 2 cubic yard bucket excavating the 102-E Drain, Station 94+00; August 23, 1960; ...
Citation