Search

You searched for: Start Over Irrigation Remove constraint Irrigation Author United States. Bureau of Reclamation Remove constraint Author: United States. Bureau of Reclamation Subject Construction workers Remove constraint Subject: Construction workers Subject Klamath Project (U.S.) -- History Remove constraint Subject: Klamath Project (U.S.) -- History Material Types Image Remove constraint Material Types: Image Database Klamath Waters Library Remove constraint Database: Klamath Waters Library

Search Results

  • 3451
    P12-200-2746A Tule Lake Division - Klamath Project -- Oregon-California. George R. Stacy, Contractor, Specifications No. 200C-541; February 27, 1964; Bureau of Reclamation photo by D. W. Stein
    Citation
  • 2072
    KP-1690- Klamath Project. Low Cost Canal Lining. Spreading "Volclay" bentonite on bank to eliminate seepage. Bentonite is spread along upper edge of bank and raked down the slope and into the top layer ...
    Citation
  • 1864
    KP-1511-R2 - Klamath Project. Steel in place, completed panels shown, screeds in place, steel men working. Paper is used to prevent curing compound getting on steel. Man with hose, who wets down subgrade ...
    Citation
  • 3797
    P12-200-2791A Klamath River - Klamath Project--Oregon. Employees of M-K Co., under contract with PP&L Co., drilling rock and placing explosive for excavation of 100' X 12' X 3500' channel through Keno ...
    Citation
  • 3798
    P12-200-2792A Klamath River - Klamath Project--Oregon. Channel is to be 12 feet deep, about two thirds in rock. River channel is at right of picture. Note dewatering pump in far background; March 3, ...
    Citation
  • 3825
    P12-200-2820A Flood Damage Repair of Lower Lost River Diversion Dam and "J" Canal - Klamath Project - Oregon - California. Specs. 200C-584, Contractor - Patterson Construction Co. Replaceing (sic) broken ...
    Citation
  • 3832
    P12-200-2823A Flood Damage Repair of Lower Lost River Diversion Dam and "J" Canal - Klamath Project - Oregon - California. Specs. 200C-584, Contractor - Patterson Construction Co. Contractor's workmen ...
    Citation
  • 3583
    KP-2567-R2-Klamath Project - TULE LAKE DIVISION, Sump 2, Specifications DC-5248, Q-Canal. Installing prefabricated metal farm turnout at Station 9+50, Q-Canal metal diaphragm in background; October 18, ...
    Citation
  • 3659
    KP-2587-R2-Klamath Project - TULE LAKE DIVISION, SUMP 3, Specifications DC-5389, N-1 Lateral. View showing workmen compacting backfill about 24-inch metal turnout at Sta.40+65; March 24, 1961; Photo by ...
    Citation
  • 4277
    P-12-200-4195NA Klamath Project - Oregon-California. Drain inlet structure at Sta. 92+10, right. Sheet piling all completed and laborer with earth wacker compacting fill inside structure; June 1976; ...
    Citation